Site work for a water / sewer project in Citrus Heights, California. Completed plans call for site work for a water / sewer project.

The Project must be completed within 260 calendar days, beginning ten (10) calendar days after the date on which the notice to proceed ("Notice to Proceed") is sent by the District to the contractor that is awarded a bid for this Project ("Contractor").In accordance with plans and specifications prepared by Water Systems Consultants Inc., the Work includes the furnishing of all labor, materials, tax, equipment, and services for the construction and completion of the following work all within the existing District's property at 8030 Ella Way.The work to be completed includes but is not limited to, constructing all above-ground appurtenances for a new groundwater production well including, a block building, sewer, distribution, storm drain, and system piping, pump and motor, site drainage.improvements;new pavement;concrete perimeter security wall ad steel fencing;automated access gate;and all site electrical and lighting. Complete sets of the Bid Forms must be used in preparing bids. The District does not assume responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents. Modifications to or withdrawal of bids may be made by the bidder prior to the bid closing deadline. Bids must be accompanied by cash, a certified or cashier's check, or a Bid Bond in favor of the District in an amount not less than (10%) of the submitted Total Bid Price. Bids will be read aloud. However, bid results are automatically made public by email transmittal to all participants of the Mandatory Pre- Bid Conference and by posting to the District's website at online The District reserves the right to reject any or all Bids and to waive any informality or irregularity in any Bid. Each bid shall be accompanied by the security referred to in the Contract Documents, the non-collusion affidavit, the list of proposed subcontractors, and all additional documentation required by the Instructions to Bidders. The successful bidder will be required to furnish the District with a Performance Bond equal to 100% of the successful bid, and a Payment Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California Pursuant to Public Contract Code Section 22300, the successful bidder may substitute certain securities for funds withheld by the District to ensure his performance under the Contract. The Director of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract which will be awarded to the successful bidder, copies of which are on file and will be made available to any interested party upon request at the District's offices, 6230 Sylvan Rd., Citrus Heights, CA 95610 or online. A copy of these rates shall be posted by the successful bidder at the job site. The successful bidder and all subcontractor(s) under him, shall comply with all applicable Labor Code provisions, which include, but are not limited to the payment of not less than the required prevailing rates to all workers employed by them in the execution of the Contract, the employment of apprentices, the hours of labor and the debarment of contractors and subcontractors. The Work involves federal funds or otherwise requires compliance with the Davis-Bacon Fair Labor Standards Act, therefore, the Contractor and all its subcontractors shall pay the higher of the state or federal prevailing wage rates, or as otherwise required by law. The Work involves federal funds or otherwise requires compliance with the Davis-Bacon Fair Labor Standards Act, therefore, the Contractor and all its subcontractors shall pay the higher of the state or federal prevailing wage rates, or as otherwise required by law. All contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work. This project will be subject to compliance monitoring and enforcement by the Department of Industrial Relations Each bidder shall be a licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following appropriate classification(s) of contractor's license(s), for the work bid upon, and must maintain the license(s) throughout the duration of the Contract: This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations In bidding on this project, it shall be the Bidder's sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law in its bid. Award of Contract: The District shall award the Contract for the Project to the lowest responsible bidder as determined from the Base Bid by the District. The District reserves. the right to reject any or all bids or to waive any irregularities or informalities in any bids or the bidding process. This Project will be funded in whole or in part by the following funding source in addition to District funds: o Clean Water State Revolving Fund (SRF) Bids must comply with all requirements associated with SRF funding, including, but not limited to, the United States Environmental Protection Agency ("USEPA") Disadvantaged Business Enterprise ("DBE") compliance, and American Iron and Steel. ***Document Notes: The entire bid package including plans and any District issued addendums can be ordered at the expense of the Contractor through the website or by calling CSDS at (916) 344-0232, 4733 Auburn Blvd, Sacramento, CA 95841. Prospective bidders may review all the documents on the website without downloading for no charge. Discrepancies in, and/or omissions from the Plans, Specifications, or other Contract Documents or questions as to their meaning shall be immediately brought to the attention of the District by submission of a written request for an interpretation or correction to the District. Such submission, if any, must be sent via email to Brian Hensley bhensley@chwd.org and received no later than Monday, September 23, 2024 at 2:00 P.M.

Bid Results

Water / Sewer

$4,109,340.00

Public - City

Site Work

59

67

6

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
46
Bidding Soon
1,382
All Active Projects
639
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 14, 2024

img_map_placeholder

8030 Ella Ct, Citrus Heights, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.