BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2025 at 7:00 PM

Updated January 18, 2025

Site work for a civil project in Citrus Heights, California. Completed plans call for site work for a water / sewer project.

Such submission, if any, must be sent via email to Brian Hensley bhensley@chwd.org and received no later than Monday, January 6, 2025 at 2:00 P.M. ELLA WAY WELL PROJECT the Work includes the furnishing of all labor, materials, tax, equipment, and services for the construction and completion of the following work all within the existing District's property at 8030 Ella Way. The work to be completed includes but is not limited to, constructing all above-ground appurtenances for a new groundwater production well including, a block building; sewer, distribution, storm drain, and system piping; pump and motor; site drainage improvements; new pavement; concrete perimeter security wall and steel fencing The successful bidder will be required to furnish the District with a Performance Bond equal to 100% of the successful bid, and a Payment Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California. The Work involves federal funds or otherwise requires compliance with the Davis-Bacon Fair Labor Standards Act, therefore, the Contractor and all its subcontractors shall pay the higher of the state or federal prevailing wage rates, or as otherwise required by law. Award of Contract: The District shall award the Contract for the Project to the lowest responsible bidder as determined from the Base Bid by the District. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or the bidding process. Question Deadline 09/23/2024 at 2:00 PM PT The Project must be completed within 260 calendar days, beginning ten (10) calendar days after the date on which the notice to proceed ("Notice to Proceed") is sent by the District to the contractor that is awarded a bid for this Project ("Contractor").

Bid Results

Water / Sewer

$3,252,675.00

Public - City

Site Work

58

44

7

2

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
410
Active Projects
169
Bidding Soon
2,301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

March 18, 2025

Project location map

8030 Ella Ct, Citrus Heights, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.