Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in San Antonio, Texas. Completed plans call for site work for a road / highway.
**As of October 24, 2024 this project has not yet been awarded. A timeline for award has not yet been established.** 4. Bidders should use unit pricing. Bid, payment, and performance bonds are required. For additional information, contact David R. Wegmann, P.E., Bexar County Public Works, Assistant County Engineer, at (210) 335-6700. Please submit all bid questions for the N. Foster Road at Wildflower Way Traffic Signal project by Wednesday, September 18, 2024 at 4:00 Scope of Project: Construction of a new traffic signal, associated pedestrian amenities, and necessary sidewalk improvements at the intersection of Foster Rd. and Wildflower Way. The Foster Road at Overlook Parkway Traffic Signal Project is located on the east side of San Antonio. The project includes the construction of a traffic signal at the intersection, replacement of sidewalk and curb ramps, and pavement markings and signing. Scope of Work: Limits: Within 600 feet of the intersection on each approach Traffic signal construction at the intersection ADA curb ramps on two corners of the intersection Pavement Markings on all approaches Replace, relocate or remove signs on each approach Underground utilities shall be located and verified prior to beginning any construction work Any request for modifications must be submitted in writing and approved by the Design Consultant & Bexar County Public Works All work will be located within the existing Right-of-Way Duration for Completion - Within 45 Working Days Liquidated Damages - $700/Working Day Schedule for Completion - One construction phase for the all traffic signal, ADA Ramps, Signing and Pavement Markings Any request for modifications must be submitted in writing and approved by the Design Consultant & Bexar County Public Works Traffic Control - Use Standard TxDOT Standard Traffic Signal Work Barricades and Signs Standards for TCP (WZ (BTS-1-2) -13
Post-Bid
Roads / Highways
$500,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2024
November 4, 2024
N Foster Rd, San Antonio, TX
Related To This Project
San Antonio, TX
Bid Date: Oct 10 2024
San Antonio, TX
--
San Antonio, TX
Bid Date: Sep 19 2024
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Oct 08 2024
San Antonio, TX
Bid Date: Sep 23 2024
San Antonio, TX
Bid Date: Sep 10 2024
San Antonio, TX
Bid Date: Sep 11 2024
San Antonio, TX
Bid Date: Oct 25 2024
San Antonio, TX
Bid Date: Sep 30 2024
San Antonio, TX
Bid Date: Sep 04 2024
San Antonio, TX
--
San Antonio, TX
Bid Date: Sep 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.