BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a bridge / tunnel in Batavia, Ohio. Completed plans call for site work for a bridge / tunnel.

This is a pre-solicitation notice for an upcoming solicitation at William H. Harsha Lake. The solicitation is expected to post by 05 September 2024 and will have approximately a 14 calendar day window before the solicitation closes. A draft Specification is attached. NO SITE VISIT will be scheduled for this project due to time constraints with the end of the fiscal year. Additional drawings will be posted with the solicitation. This project was previously solicited as W912QR24Q0075. The contract will be awarded using simplified acquisition procedures (SAP). This project consists of a base quote to install a government furnished contractor installed (GFCI) horizontal lifeline fall protection system on the catwalk under the control tower service bridge at William H. Harsha Lake in Batavia Township, OH. The contractor is responsible for fabricating and installing the steel assemblies for the lifeline connection points. There are 24 connection points which consist of 5 different types of connection configurations. The contractor is also responsible for all materials and labor associated with the installation of the government furnished contractor installed (GFCI) horizontal lifeline system. The horizontal lifeline system has already been acquired by the site staff and will be provided to the contractor for installation (GFCI). The final system will consist of a total of 680 LF of lifeline, made up of two 160 LF systems and two 180 LF systems. There are no options to the contract. Work will begin within 14 calendar days of the Notice to Proceed (NTP) and will conclude 120 calendar days after the NTP. the estimated price range for this project w ill be between $25,000 and $100,000. Please note, that all questions shall be submitted within five (5) days of the solicitation closing date. The Government will respond within two (2) days of the solicitation closing date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$100,000.00

Public - Federal

Site Work

14

12

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
88
Bidding Soon
1,396
All Active Projects
587
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2024

October 23, 2024

img_map_placeholder

To Be Determined, Batavia, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.