Published October 2, 2024 at 8:00 PM
Updated October 3, 2024
Site work and paving for a road / highway in Foley, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.
furnishing all labor and materials and performing all work required by Baldwin County and described as follows: PROJECT NO. HW2110200 - PAVE CR-65 FROM CR-24 TO CR-28 FORTY (40) WORKING DAYS are allowed for the construction of the project. Working Day (Daytime Work). Any Calendar Day from midnight to midnight, exclusive of Saturdays and Legal Holidays (as defined herein), on which the Contractor could proceed with construction operations for a period of six hours or more with the normal working forces engaged in performing work on the controlling item or items of work, which normally would be in progress at that time, will be classified as a working day. Saturdays and Legal Holidays on which the Contractor elects to work for a period of four hours or more will be classified as a working day. All bids must be on blank forms provided in the Specifications with the Contract booklet submitted in its entirety. A cashier's check drawn on an Alabama bank or a Bidder's Bond, payable to Baldwin County, Alabama, for an amount not less than five percent (5%) of the amount bid, but in no event more than ten thousand dollars ($10,000) shall be filed with the proposal. The bidder's bond shall be prepared on the form specified and signed by a bonding company authorized to do business in the State of Alabama. A performance bond in the form and terms approved by the County in an amount not less than the contract price will be required at the signing of the contract. A labor and materials bond in the form and terms approved by the County in an amount not less than one hundred percent (100%) of the contract price insuring payment for all labor and materials shall also be required at the signing of the contract. In addition, the Contractor must furnish to the County, at the time of the signing of the contract a certificate of insurance coverage as provided in the specifications. The right is reserved to reject any and/or all bids and to waive informalities or irregularities and to furnish any item of material or work, and to change the amount of said contract. Liquidated damages for non-completion of the work within the time limit agreed upon will be assessed in accordance with the terms of the contract. Please contact Stacy Appleton at sappleton\baldwincountyal.gov with any questions. No bid shall be withdrawn for a period of thirty (30) days subsequent to the opening of bids without the consent of the County Commission of Baldwin County, Alabama. Compliance with Davis Bacon Wage Act is not required; however, Contractor is encouraged to provide a prevailing wage to its employees and subcontractors.
Bid Results
Roads / Highways
$1,019,403.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 25, 2024
October 25, 2024
Co Rd 65, Foley, AL
Related To This Project
Foley, AL
--
Foley, AL
Bid Date: Oct 11 2024
Foley, AL
--
Foley, AL
Bid Date: Oct 31 2024
Foley, AL
Bid Date: Nov 14 2024
Foley, AL
Bid Date: Sep 27 2024
Foley, AL
Bid Date: Sep 17 2024
Foley, AL
Bid Date: Sep 05 2024
Foley, AL
Bid Date: Sep 04 2024
Foley, AL
Bid Date: Apr 19 2019
Foley, AL
Bid Date: Aug 29 2024
Foley, AL
Bid Date: Aug 13 2024