BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 26, 2024 at 7:00 PM

Updated December 27, 2024

Site work for a water / sewer project in Palo Alto, California. Conceptual plans call for site work for a water / sewer project.

This project will provide tank rehabilitation, seismic upgrades, and/or tank replacement structural reinforcement for the Corte Madera, Park, Boronda, and Dahl reservoirs to improve earthquake resistance in compliance with the American Society of Civil Engineers (ASCE 7) seismic codes. Work at the reservoir sites will also include the installation of: new seismic shut off valves between the reservoirs and valve vaults, new plug valves, piping and pipe supports in the valve vaults, and recoating of the interior and exterior reservoir walls. This project is included in the City of Palo Alto's FY 2025-2029 Capital Improvement Program (CIP). As of December 26, 2024, information regarding a design team or a general contractor is not available. Construction is anticipated from 2025 to 2029.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$16,937,832.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
183
Bidding Soon
2,780
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

Multiple Locations, Palo Alto, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.