EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 26, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Plano, Texas. Completed plans call for site work for a educational facility; and playground / park / athletic field.

Plano Independent School District is requesting Competitive Sealed Proposals for: Upper & Lower Playground Replacements at Nine Elementary Campuses SCOPE OF WORK: Removal and replacement of the upper and lower grade level playgrounds at Andrews, Barron, Daffron, Dooley, Hickey, Mathews, Harrington, Saigling, and Skaggs Elementary Schools in the Plano Independent School District. Each of the 18 new playgrounds will include playground equipment, synthetic turf surfacing, and shade structure. The estimated budget and Location: Estimated Budget - $6,000,000 and $35,000/Playground ($70,000/School) owner's contingency Project Location - Andrews Elementary - 2520 Scenic Dr, Plano, TX 75025 Barron Elementary - 3300 P Ave, Plano, TX 75074 Daffron Elementary - 3900 Preston Meadow Dr, Plano, TX 75093 Dooley Elementary - 2425 San Gabriel Dr, Plano, TX 75074 Hickey Elementary - 4100 Coldwater Creek Ln, Plano, TX 75074 Mathews Elementary - 7500 Marchman Way, Plano, TX 75025 Harrington Elementary - 1540 Baffin Bay Dr, Plano, TX 75075 Saigling Elementary - 3600 Matterhorn Dr, Plano, TX 75075 Skaggs Elementary - 3201 Russell Creek Dr, Plano, TX 75025 Question Deadline 09/17/2024 at 4:00 PM CT

Post-Bid

Educational

$6,000,000.00

Public - City

Site Work

53

11

4

2

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering, Fill
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
77
Bidding Soon
3,296
All Active Projects
1,245
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Upper and Lower Playground Replacements at Nine Elementary Campuses

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.