Published October 30, 2024 at 8:00 PM

Updated October 31, 2024

Site work for a water / sewer project in Armstrong, Pennsylvania. Completed plans call for site work for a water / sewer project.

Questions Due Date: Oct 8th 2024, 4:00 PM EDT Questions shall be submitted via online Williamsport Municipal Water Authority (Owner) is requesting Bids for the construction of the following Project: Frank E. Heller Dam Spillway Rehabilitation. The Project includes the following Work: Diversion and Control of Water, demolition of concrete spillway and its associated drainage system; construction of new drainage system, reinforced concrete spillway, weir, stilling basin, training walls, and chute blocks; backfilling of completed spillway and stabilization of denuded areas. Bids are requested for the following Contract: General Contract Owner anticipates that the Project's total bid price will be from $2,500,000 to $3,500,000. Anticipated Project Schedule The Project has an expected duration of 298 days from the time of Full Notice-to-Proceed to substantial completion. Review the anticipated project schedule and notes provided below. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Winning Bidder Notified: November 29, 2024* Partial Notice-to-Proceed: 2 weeks after winner notified Full Notice-to-Proceed: December 27, 2024 Substantial Completion: 298 days from Full NTP For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Bid Results

Water / Sewer

$2,116,111.00

Public - County

Site Work

70

26

6

4

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
3
Bidding Soon
881
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

December 27, 2024

Project location map

Sulphur Springs Rd, Armstrong, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.