BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Rockford, Illinois. Completed plans call for the renovation of a transportation facility.

The project work consists of the following major items and approximate quantities: The Base Bid scope of work shall include removal and replacement of one (1) Passenger Boarding Bridge, installation of one (1) new Ground Power Unit, Installation of one (1) new Preconditioned Air Unit, installation of one (1) new Baggage Slide, and associated electrical upgrades. The Additive Alternate 1 scope of work shall include the removal, salvage, and replacement of one (1) Passenger Boarding Bridge, installation of one (1) new Ground Power Unit, Installation of one (1) new Preconditioned Air Unit, installation of one (1) new Baggage Slide, and associated electrical upgrades The Disadvantaged Business Enterprise (DBE) goal for the project has been established at 2.5%. A bid bond, cashiers check, or a certified check made payable to the order of the Chicago Rockford International Airport in the amount of ten percent (10%) of the total bid must be deposited by each bidder with his bid as guarantee that in case the contract is awarded to him, he will within fifteen (15) days thereafter, upon receipt of written notice of award, execute such contract and furnish a satisfactory performance bond. Upon failure to do so, he shall forfeit the deposit as liquidated damages and acceptance of the bid will be contingent upon the fulfillment of this requirement by the bidder. The checks or bid bonds of all, except the three (3) lowest responsible bidders, will be returned within ten (10) days after the bids are opened and read. The successful bidder, as determined by the Owner, will be required to agree that no less than the prevailing rate of wages will be paid to all workmen, laborers, and mechanics performing their work under this contract. All proposals must be made on forms furnished within this set of Contract Documents. The successful bidder will be required to furnish performance bond satisfactory to the owner in the amount of the contract. The owner reserves the right to waive or not to waive any irregularities in the bids and to reject any or all bids and to determine which is the lowest and best bid or combination of bids for the improvements.

Award

Transportation Terminals

$1,551,000.00

Public - City

Renovation

18

8

2

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
113
Bidding Soon
2,124
All Active Projects
909
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2024

November 19, 2024

img_map_placeholder

60 Airport Dr, Rockford, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.