BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in San Diego, California. Completed plans call for the renovation of a educational facility.

Preconstruction Services for Hardy Elementary School Whole Site Modernization (LLB). Project: Hardy Elementary School Phase 1 Site Modernization, Interim Housing, Phase 2 Site Modernization, and Joint-Use Field. 1. The Phase 1 Site Modernization and Interim Housing of Hardy Elementary School will include: i. The removal of (10) portable classroom buildings, one classroom building, and one lunch shelter. ii. New construction of a permanent kitchen building and lunch shelter. iii. New construction of (11) temporary portable classroom buildings and (1) portable restroom building. iv. Site work including a new parking and drop-off plaza, (2) new playgrounds, new hardcourts, new turf play area, a new fire access lane and path of travel upgrades throughout campus. 2. The Phase 2 Site Modernization of Hardy Elementary School will include: v. The removal of (2) portable classroom buildings, one MPR building, (11) temporary portable classroom buildings, and (1) portable restroom building. vi. Modernization of (1) classroom building, (1) library building, and (1)administration building. vii. New construction of (1) 2-story classroom building, (1) administration building, (1) MPR building, and (1) solar array on lunch shelter. viii. Site work including (2) kindergarten playgrounds, hardcourts, landscaping, parking lot, and Joint-Use Field CSLB License Required: B 1. GMP 1 Phase 1-1: Demolish field / backstop, build temporary Kinder play area, New asphalt play area. Build 2 new play structures and hardcourts. Build (11) temporary portable classroom buildings and 1 portable restroom building. Work of this phase shall commence after substantial completion of the previous phase and be substantially complete and ready for occupancy prior to the following phase. 2. GMP 1 Phase 1-2: Demolish (8) portable classroom buildings, demolish 1 classroom building, demolish 1 lunch shelter, demolish 1 playground, build new parking lot and retaining wall at slope repair, build new kitchen building and new lunch shelter. Install kitchen equipment due to long lead times. Work of this phase shall commence after substantial completion of the previous phase and be substantially complete and ready for occupancy prior to the following phase. 3. GMP 2 Phase 2-1: Demolish (2) portable classroom buildings and hardscape. Build new administration building, new 2 story classroom building, (2) new playgrounds, new hardcourts and new landscaping modernize Work of this phase shall commence after substantial completion of the previous phase and be substantially complete and ready for occupancy prior to the following phase. 4. GMP 2 Phase 2-2: Modernize 1 library building. Work of this phase shall commence after substantial completion of the previous phase. 5. GMP 2 Phase 2-3: Modernize Classroom building, renovate hardscape, move classrooms to temporary portables. Work of this phase shall commence after substantial completion of the previous phase and be substantially complete and ready for occupancy prior to the following phase. 6. GMP 2 Phase 2-4: Modernize administration building and MPR. Renovate Hardscape. Work of this phase shall commence after substantial completion of the previous phase and be substantially complete and ready for occupancy at time of Substantial Completion of the Work. 7. GMP 2 Phase 2-5: Renovate South Parking Lot. Work of this phase shall commence after substantial completion of the previous phase and be substantially complete and ready for occupancy at time of Substantial Completion of the Work. 8. GMP 2 Phase 2-6: : Remove (11) portable classroom buildings, build Joint-Use Field. Work of this phase shall commence after substantial completion of the previous phase and be substantially complete and ready for occupancy at time of Substantial Completion of the Work.

Post-Bid

Educational

$5,000,000.00

Public - City

Renovation

350

14

11

11

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
29
Bidding Soon
827
All Active Projects
370
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

November 18, 2024

img_map_placeholder

5420 Montezuma Rd, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.