BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Cathedral City, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.

Department: Administrative User Department, City Manager, City Clerk, Mayor & Council, City Attorney, Community and Economic Development Department, Planning, Engineering, Building, Business License, Public Works, Traffic, Business Resources, Environmental Conservation, MIS - Information Technology, Successor Agency, Housing Assistance, Financial Services Department, Human Resources, Public Safety, Police, Fire, Chamber of Commerce, Library, Senior Center, Animal Control, Communications, Economic Development, Oversight Board, Code Compliance, Vacation Rentals. PURPOSE The City of Cathedral City (City) is requesting proposals from qualified professional engineering consultants, licensed in the State of California, with the intent of entering into an agreement to provide professional engineering design services for one or multiple Highway Safety Improvement Program (HSIP) Cycle 11 Projects. The three projects available include eighteen Intersection Upgrades (C08754), two Signalized Pedestrian Crossings (C08755), and one Pedestrian Crossing (C08757). In general, the selected Consultant shall be responsible for the preparation of all improvement plans, preliminary and final cost estimates, and project specifications for this Project. BACKGROUND The City of Cathedral City successfully received funding through HSIP Cycle 11 to complete improvements prioritizing roadway safety for all users of Cathedral City roads, including motorists, pedestrians, and bicyclists. Funding is separated into three projects. For City Project No. C08754, eighteen unsignalized intersections throughout the city will be improved. The scope of work for this project includes providing pedestrian crosswalk upgrades such as LED street lighting, curb extensions, ADA ramps, flashing stop signs, high visibility crosswalk striping, and advanced warning pavement markings and signs. The total design and construction cost for this project is $1,452,100.00. For City Project No. C08755, improvements will be completed at the intersection of 30th Avenue and Avenida La Paz, and the intersection of Cathedral Canyon Drive and Ortega Road. The scope of work for this project includes providing pedestrian signals/hybrid beacons (HAWK), ADA Ramps, LED safety lighting, high visibility crosswalk striping, and advanced warning pavement markings and signs. The total design and construction cost for this project is $1,066,300.00. For City Project No. C08757, improvements will be completed at the intersection of 30th Avenue and San Eljay Avenue. The scope of work for this project includes providing Pedestrian school crossing enhancements, ADA ramps, flashing stop signs, school zone flashing beacons, and LED safety lighting. The total design and construction cost for this project is $277,600.00. Deadline for Submittal of Questions September, 6, 2024. Response to Questions September 11, 2024

Conceptual

Roads / Highways

$1,452,100.00

Public - City

Paving, Site Work

4

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
159
Bidding Soon
1,914
All Active Projects
924
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 18, 2025

img_map_placeholder

Multiple Locations, Cathedral City, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.