BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Cathedral City, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The scope of work consists of furnishing all supervision and labor, materials, necessary equipment and tools, utility work, traffic control and public services coordination required for the completion of the Project. The proposed improvements include the installation (re-striping) of pavement markings including but not limited to: Center Lines; Lane Lines, Median Islands; Two-way Left Turn Lanes; Intersection Markings; Bike Lane Lines; Lane Lines Through Intersections; Pavement Word, Symbol, and Arrow Marking; Stop Lines; Crosswalk Lines, Yield Line; Red Curb Marking; Chevron and Diagonal Crosshatch Marking; and installation of raise pavement markers as required by the CA MUCTD 2014 Edition and by Section 84 of the of California Department of Transportation Standard Specifications, the Project's Standard Specifications, or Special Provisions which shall be performed, placed, constructed, or installed within public streets right-of-way. All work and resulting facilities will fully conform to the current adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 including Best Management Practices during the construction process. All project work and incidental items to complete the project shall be performed in accordance with the plans, specifications, and other provisions of the contract. All the above improvements are to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition. This project is to be completed within Seventy-Five (75) calendar days from the date specified in the Notice to Proceed. Time for commencement and completion of the work is important and is to be of the essence of the Contract. The successful bidder should plan to order any long lead-time equipment items immediately following Notice of Award. Bid security in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures is required to be submitted with each bid, as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fails to furnish in a timely manner the bonds and/or proof of insurance. The Contractor shall not begin any construction activity at the site before the issuance of the Notice to Proceed. Any Work that is done by the Contractor in advance of the Notice to Proceed shall be considered as being done at the Contractor's own risk and responsibility, and as a consequence will be subject to rejection. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates, including the per diem wages applicable to the work, and for holiday and overtime work, including employer payments for health and welfare, pension, vacation, and similar purposes, in the County of Riverside in which the work is to be done, have been determine by the Director of the Department of Industrial Relations, State of California. The City reserves the right to reject any or all bids, and to waive any irregularities in the bids. Pursuant to Section 1770, et. seq., of the California Labor Code, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations Questions regarding the meaning and intent of the Contract Documents shall be referred in writing by the Contractor to the City Engineer.

Award

Roads / Highways

$199,965.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
47
Bidding Soon
886
All Active Projects
431
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

November 22, 2024

img_map_placeholder

Multiple Locations, Cathedral City, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.