BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Folcroft, Pennsylvania. Completed plans call for site work for a water / sewer project.

Ashland Avenue Pipe Replacement Project Bidders are required to provide Bid Security in an amount equal to 10% of the total amount bid. Bid Security may be provided in the form of a certified check or a bid bond issued by a Surety Company licensed to transact such business in the Commonwealth of Pennsylvania. Upon award of a contract, the Successful Bidder shall provide a Performance Bond and a Labor and Materials Payment Bond, each in the amount of 100% of the awarded contract value. All questions during the bidding period must be submitted through web site. Answers to any questions received during the bidding period will be distributed to all bidders through web site. Any questions received by means other than through web site will not be answered. Whether a question is responded to by the Local Contracting Agency is at the sole discretion of the Local Contracting Agency. B. Bidders can submit questions by visiting the project solicitation on web site and selecting the "Ask A Question" button from within the project solicitation. Questions may be submitted until the question cutoff time that is established on the "Project Details" tab within the project solicitation. The Borough of Folcroft is replacing a collapsed storm sewer pipe along Ashland Avenue that crosses underneath Delmar Drive. The project includes replacement of the existing corrugated metal storm pipe with a reinforced concrete storm pipe, connection to existing storm sewer structures, permanent pavement restorations, ADA curb ramp replacement, concrete curb replacement, installation of concrete bollards, replacement of an existing traffic sign, asphalt and concrete driveway/parking area restorations, landscaping and incidental work. The scope of work is more fully described in the Project Specifications herein and on the Project Plans. 2. The Borough will be paving Ashland Avenue under a separate contract for the 2024 Road Program which will be performed within a similar time frame to the Ashland Avenue Pipe Replacement Project. The Contractor will be responsible for coordinating with the Contractor for the 2024 Road Program to ensure that all work performed within the cartway of Ashland Avenue is completed prior to paving operations

Bid Results

Water / Sewer

$88,410.00

Public - City

Site Work

8

14

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
378
Active Projects
185
Bidding Soon
3,368
All Active Projects
1,583
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2024

October 1, 2024

img_map_placeholder

E Ashland Ave, Folcroft, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.