BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2025 at 7:00 PM

Updated February 20, 2025

Demolition, site work, renovation and addition to an educational facility in Hills, Minnesota. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

As of February 2025, construction is expected to start in the Summer of 2025. Building Demolition and Alterations to Hugo Goehle Gym BID SECURITY Each bid in excess of $20,000 shall be accompanied by a bid security of 5% of the maximum amount of the bid in the form of a Surety Bond, Certified Check or Cashier's Check. PERFORMANCE AND PAYMENT BONDS Each successful prime contract bidder shall furnish a Performance and Payment Bonds in the full amount of the contract if contract exceeds $20,000. Surety must be authorized to do business in State of Minnesota. WITHDRAWAL OF BIDS A bidder may withdraw the proposal at any time before the time set for opening of the bids. No bidder may withdraw a bid for a period of Forty Five (45) days after the scheduled closing time for the receiving of bids. The Owner anticipates being able to award a contract within Forty-Five (45) days from bid opening. Preliminary schedule is included in this project manual. Contractors shall coordinate work with the Construction Manager to meet the schedule as required. The Owner reserves the right to reject any and all bids, accept any bids it deems to be in its best interest, waive any informalities in bids submitted and waive minor discrepancies in bidding procedures if the bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein. Building demolition of existing 3 story building and correlating buildings. Alterations to Hugo Goehle Gym and mechanical upgrades Direct communications regarding drawings or specifications on this project to Sara Fox of ATSR Architects, phone (763) 525-3239, sfox@atsr.com Direct communications regarding bidding procedure & schedule on this project to Brad Bednar of R. A. Morton Construction Managers, phone (320) 223-6088, bradb@ramorton.com *Addendum 1 and 2 have been released.

Award

Educational

$1,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

44

24

14

1

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
45
Bidding Soon
497
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

July 14, 2025

Project location map

204 E 2nd St, Hills, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.