Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 21, 2024 at 8:00 PM

Updated October 22, 2024

Site work for a water / sewer project in Sheridan, Wyoming. Completed plans call for site work for a water / sewer project.

Bus Barn Wash Bay Reconstruction. Site Address: Brundage Lane, east of I-90 off-ramp. Start date is tentatively June 5, 2025 Work shall be substantially completed no later than July 18, 2025. Final Completion 7 days following Substantial Completion Est. Completion Date: July 25, 2025. Site Directions: On Brundage Lane, just east of I-90/Brundage Lane Exit offramp. South of Commercial Ave. Entrance. Description: Remove existing concrete surfacing and wash bay drain; install new surfacing, drain, sand-oil separator, and associated pipe connections. Question Deadline 10/04/2024

Award

Water / Sewer

$81,000.00

Public - County

Site Work

9

9

2

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
9
Bidding Soon
116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

June 5, 2025

Project location map

E Brundage Ln, Sheridan, WY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed