BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2024 at 8:00 PM

Updated September 28, 2024

Renovation of an educational facility in Charleston, South Carolina. Completed plans call for the renovation of a educational facility.

Hollings Cancer Center Air Handler #6 Replacement Replacement of Air Handler #6 in the Hollings Cancer Center. The Existing Air Handler is Approximately 20 Vears Old and Nearing the End of Its Serviec Life. The Air Handler Has Significant Deterioration. Air Handier 96 in Critical to Hollings Cancer Center Research Operations and Needs to Be Replaced. Location 86 Jonathan Lucas Street, Charleston, SC 29425 Bid Security is Required in An Amount Not Less Than 5% of the Base Bid. Performance and Labor & Material Payment Bonds: the Successful Contractor Will Be Required to Provide Performance and Labor and Material Payment Bonds, Each in the Amount of 100% of the Contract Price. Construction Cost Range $1,700,000 to $2,000,000 Bid Security is Required in An Amount Not Less Than 5% of the Base Bid. Performance and Labor & Material Payment Bonds: the Successful Contractor Will Be Required to Provide Performance and Labor and Material Payment Bonds, Each in the Amount of 100% of the Contract Price. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$2,000,000.00

Public - State/Provincial

Renovation

26

19

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

November 25, 2024

Project location map

86 Jonathan Lucas St, Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.