BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 19, 2024 at 8:00 PM

Updated October 20, 2024

Site work for a water / sewer project in Raymore, Missouri. Completed plans call for site work for a water / sewer project.

Anticipated Scope of Services: Replace the existing DIP force Main. Installation of 24" DR 21 C900 Green PVC pipe force main to replace the existing DIP force main. This segment is 2050 feet long, between stations 52+99 and 73+50. The new line is to be laid adjacent to the existing. The adjacent creek will have to be crossed with line items addressing the crossings, the rip rap and encasement of the pipe. The lift station ponds have a maximum storage capacity of three days. Contractor must take this into account during construction.

Bid Results

Water / Sewer

$561,450.00

Public - City

Site Work

5

3

2

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
95
Bidding Soon
1,215
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2024

October 24, 2024

Project location map

Multiple Locations, Raymore, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.