Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2024 at 8:00 PM

Updated October 20, 2024

Site work for a water / sewer project in Raymore, Missouri. Completed plans call for site work for a water / sewer project.

Anticipated Scope of Services: Replace the existing DIP force Main. Installation of 24" DR 21 C900 Green PVC pipe force main to replace the existing DIP force main. This segment is 2050 feet long, between stations 52+99 and 73+50. The new line is to be laid adjacent to the existing. The adjacent creek will have to be crossed with line items addressing the crossings, the rip rap and encasement of the pipe. The lift station ponds have a maximum storage capacity of three days. Contractor must take this into account during construction.

Bid Results

Water / Sewer

$561,450.00

Public - City

Site Work

5

3

2

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
85
Bidding Soon
1,336
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2024

October 24, 2024

Project location map

Multiple Locations, Raymore, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed