Published October 21, 2024 at 8:00 PM

Updated October 22, 2024

Site work for a transportation facility in Juneau, Alaska. Completed plans call for site work for a transportation facility.

This project consists of construction of an on-route electric bus charging facility at the Valley Transit Center. WORK includes installation of large industrial electrical service, electric bus charging equipment, automated electric bus charge poles, selective concrete demolition, structural concrete for pole foundations, earthwork and trenching, modification of existing and placement of new underground electrical conduit and vaults, cables and conductors, and concrete flatwork. WORK also includes coordination with Capital Transit to minimize impact to bus operation during construction; coordination with the local electric utility for connection of new electrical service; coordination with OFCI switchboard manufacturer and charger manufacturer for startup and commissioning and all ancillary work resulting in the functional performance of the on-route bus charging system and restoration of facilities disturbed by construction and miscellaneous related WORK. Question Deadline 09/18/2024 at 4:30 PM AKT The site of the WORK is the Transit Island of the CBJ Capital Transit - Valley Transit Center, located on Mendenhall Mall Road, Juneau, Alaska 99801. The location was pre-prepared with an underground vault and roughed in conduits from Construction completed in Fall 2023. ARCHITECT'S ESTIMATE RANGE: Between $250,000 & $300,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All communications relative to this WORK, prior to opening Bids, shall be directed to the following: Greg Smith, Contract Administrator CBJ Engineering Department, 3 rd Floor, Marine View Center Email: Greg.Smith@juneau.org Telephone: (907) 586-0800 ext. 4196 This project consists of Construction of an on-route electric bus charging facility at the Valley Transit Center. WORK includes installation of large industrial electrical service, electric bus charging equipment, automated electric bus charge poles, selective concrete demolition, structural concrete for pole foundations, earthwork and trenching, modification of existing and placement of new underground electrical conduit and vaults, cables and conductors, and concrete flatwork.

Award

Transportation Terminals

$280,500.00

Public - City

Site Work

27

22

52

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
4
Bidding Soon
59
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

October 31, 2024

Project location map

9114 Mendenhall Mall Rd, Juneau, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.