BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Burnsville, West Virginia. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Work will consist of concrete patching and repair, epoxy crack injection, application of concrete protective coating on all exposed concrete surfaces, placement of gabion baskets at the downstream corner of abutment #1 to retain roadway fill, milling, application of waterproofing membrane, pavement of the structure, and replacement of guardrail. Traffic will be maintained using flaggers. The area of ground disturbance will be minimal, with only a few square feet of disturbance anticipated for repair operations and placement of gabion baskets at abutment #1. All work will be within the existing right of way. There will be no tree removal or work below OHW. Crosses state listed mussel stream - Saltlick Creek, no work below OHW. Contract : 2023040003 State Project : S304- CHSB/00 0.02 00 Federal Project STBG-2023(144)D County: Braxton Structure Replacement Midpoint Braxton Church St Bridge Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must submit electronically with their bid a Proposal Guaranty Bond for $500.00 or 5% of the total bid, whichever is greater. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. WVDOT - 016 - Church St Bridge

Bid Results

Bridges / Tunnels

$213,696.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

27

5

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
21
Bidding Soon
293
All Active Projects
122
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

December 9, 2024

img_map_placeholder

Church St, Burnsville, WV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.