Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Grinnell, Iowa. Completed plans call for site work for a water / sewer project.
Question Deadline 09/15/2024 at 10:00 PM CT It is the intent of the Iowa DOT to award the contract to the responsible contractor whose submitted quote is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. Other factors may also include a comprehensive review of bidders past work performance, and work capacity. Questions: Until the contract is awarded the sole point of contact for this project is Julie Brown @ julie.brown@iowadot.us (see bid contact information). Any questions related to this project are to be submitted to Julie Brown in writing preferable through the Site. (See the cut off period for question submissions) DOT estimated start date is 09/15/2024 This is the estimated start date after all required documents are received (i.e., Insurance, performance bond and vendor signed contract) Project end date- 12/01/2024 (This includes resolution to all punch list items, inspections and DOT acceptance typically used in construction bids). This is a time sensitive project please see the attributes to indicate lead time concerns and once all materials are available how quickly can the work be done. No considerations or revision in the contract price or scope of the project will be considered by the Iowa DOT for any item which could have been revealed by a thorough on-site inspection and examination. The award contract will be required to field verify the pipe measurements prior to ordering materials. Contractor is required to provide all materials, equipment and labor for the removal and replacement of material as per plans/specifications outlined on the Line Item tab. This includes the disposal of all debris off site. Davis-Bacon wages do not apply. This is a tax exempt project. IA DOT - Sewer Lining for the Grinnell Maintenance Garage
Award
Water / Sewer
$21,250.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2024
October 21, 2024
902 Ogan Ave, Grinnell, IA
Related To This Project
Grinnell, IA
Bid Date: Oct 17 2024
Grinnell, IA
Bid Date: Oct 23 2024
Grinnell, IA
Bid Date: Nov 19 2024
Grinnell, IA
--
Grinnell, IA
--
Grinnell, IA
Bid Date: Dec 04 2024
Grinnell, IA
Bid Date: Feb 16 2021
Grinnell, IA
--
Grinnell, IA
--
Grinnell, IA
--
Grinnell, IA
Bid Date: Aug 14 2024
Grinnell, IA
Bid Date: Jul 19 2024
Grinnell, IA
Bid Date: Jun 11 2024
Grinnell, IA
Bid Date: May 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.