BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Grinnell, Iowa. Completed plans call for site work for a water / sewer project.

Question Deadline 09/15/2024 at 10:00 PM CT It is the intent of the Iowa DOT to award the contract to the responsible contractor whose submitted quote is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. Other factors may also include a comprehensive review of bidders past work performance, and work capacity. Questions: Until the contract is awarded the sole point of contact for this project is Julie Brown @ julie.brown@iowadot.us (see bid contact information). Any questions related to this project are to be submitted to Julie Brown in writing preferable through the Site. (See the cut off period for question submissions) DOT estimated start date is 09/15/2024 This is the estimated start date after all required documents are received (i.e., Insurance, performance bond and vendor signed contract) Project end date- 12/01/2024 (This includes resolution to all punch list items, inspections and DOT acceptance typically used in construction bids). This is a time sensitive project please see the attributes to indicate lead time concerns and once all materials are available how quickly can the work be done. No considerations or revision in the contract price or scope of the project will be considered by the Iowa DOT for any item which could have been revealed by a thorough on-site inspection and examination. The award contract will be required to field verify the pipe measurements prior to ordering materials. Contractor is required to provide all materials, equipment and labor for the removal and replacement of material as per plans/specifications outlined on the Line Item tab. This includes the disposal of all debris off site. Davis-Bacon wages do not apply. This is a tax exempt project. IA DOT - Sewer Lining for the Grinnell Maintenance Garage

Award

Water / Sewer

$21,250.00

Public - State/Provincial

Site Work

12

7

13

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
44
Bidding Soon
668
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

October 21, 2024

img_map_placeholder

902 Ogan Ave, Grinnell, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.