Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Moab, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The scope of work includes construction of 7.11 miles of beginner and intermediate machine-built bike-optimized trail as part of the Mud Springs Trail System (MSTS). The MSTS is a planned, multi-phase, 20+ mile stacked loop trail system located in the Spanish Valley area of northern San Juan County, Utah. (Attachment 1) This proposal will focus on Phase 1 of construction, as described below. Coordinates of the trailhead are 38.43256, -109.42229. The trails will be purpose-built for mountain bike and Class 1 E-bike riding. Trails will be designed to accommodate diverse skill levels, adaptive cycles (Attachment 2), and National Interscholastic Cycling Association (NICA) races. The Moab NICA race will be moved to MSTS when it is complete. Work must be completed between August 1st and November 30th in accordance with wildlife restrictions (mule deer and migratory birds.) Ideal candidates will be able to complete the project within the build window in 2025. However, it is reasonable that the project will take place during build windows in both 2025 and 2026, focusing on Group 1 in 2025 and Group 2 in 2026. SEND PROPOSAL INQUIRIES TO: Evan Smiley Active Transportation & Trails Department 125 E. Center St. Moab, UT 84532 Email: esmiley@ grandcountyutah.net The scope of work includes construction of 7.11 miles of beginner and intermediate machine-built bikeoptimized trail as part of the Mud Springs Trail System (MSTS). The MSTS is a planned, multi-phase, 20+ mile stacked loop trail system located in the Spanish Valley area of northern San Juan County, Utah. (Attachment 1) This proposal will focus on Phase 1 of construction, as described below. Coordinates of the trailhead are 38.43256, -109.42229. The trails will be purpose-built for mountain bike and Class 1 E-bike riding. Trails will be designed to accommodate diverse skill levels, adaptive cycles (Attachment 2), and National Interscholastic Cycling Association (NICA) races. The Moab NICA race will be moved to MSTS when it is complete.
Post-Bid
Roads / Highways
$810,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 18, 2024
November 11, 2024
Multiple Locations, Moab, UT
Related To This Project
Moab, UT
Bid Date: Sep 24 2024
Moab, UT
Bid Date: Oct 09 2024
Moab, UT
Bid Date: Oct 21 2024
Moab, UT
Bid Date: Nov 07 2024
Moab, UT
Bid Date: Dec 09 2024
Moab, UT
Bid Date: Dec 10 2024
Moab, UT
Bid Date: Jan 19 2021
Moab, UT
Bid Date: Aug 29 2024
Moab, UT
Bid Date: Aug 28 2024
Moab, UT
Bid Date: Jun 11 2024
Moab, UT
Bid Date: Jun 27 2024
Moab, UT
Bid Date: Jun 11 2024
Moab, UT
Bid Date: May 23 2024
Moab, UT
Bid Date: May 31 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.