BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2024 at 8:00 PM

Updated September 21, 2024

Site work for a water / sewer project in Haverhill, Massachusetts. Completed plans call for site work for a water / sewer project.

Project Installation of Two Pre-purchased Vulcan Stair Screens at the Wastewater Treatment Plant. Question Deadline 09/13/2024 at 4:00 PM ET Questions concerning this bid must be submitted in writing by email to Steven Bucuzzo at purchasing@cityofhaverhill.com and Written responses may be emailed to all bidders on record having obtained the IFB from purchasing@cityofhaverhill.com. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work will generally consist of the following: 1. The City of Haverhill Purchased two (2) Vulcan Stair Screen (Model No: ESR 28/1662/6). The Contractor is responsible for demolition and removal of the existing stair screens. 2. The contractor is responsible for developing a detailed installation plan including timeline and coordinate with plant management to schedule installation activities. 3. Installation consists of preparing the installation site, including any necessary modifications to existing structures and ensure all safety protocols are in place and adhered to. 4. Contactor will install the two Vulcan Stair Screens as per manufacturer specifications and ensure proper alignment and secure mounting of screens, reconnect screens to existing electrical systems and verify electrical connections are compliant with relevant codes and standards, reconnect screens to existing control systems and ensure control systems are fully functional and integrated with the new screens, reconnect screens to existing wash press and ensure wash press operates correctly with the new screens. 5. Vulcan will provide the services of a factory employed service technician who shall adequately inspect the installation, test the equipment, and instruct the owner's operating personnel in its maintenance and operation; and will provide two (2) trips of four (4) days to inspect and certify operation.

Post-Bid

Water / Sewer

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
484
Active Projects
210
Bidding Soon
3,463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2024

October 21, 2024

Project location map

40 S Porter St, Haverhill, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.