BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Haverhill, Massachusetts. Completed plans call for site work for a water / sewer project.

Estimated Cost $100,000 Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 10/11/2024 at 4:00 PM ET Questions concerning this bid must be submitted in writing by email to Steven Bucuzzo at purchasing@haverhillma.gov, Written responses may be emailed to all bidders on record having obtained the IFB from purchasing@haverhillma.gov Pump Station Hoist Replacement - South Mill Street . The work will generally consist of the following: 1. The Contractor is responsible for demolition and removal of the existing Hoist. 2. The contractor is responsible for developing a detailed installation plan including timeline and coordinate with plant management to schedule installation activities. 3. Installation consists of preparing the installation site, including any necessary modifications to existing structures and ensure all safety protocols are in place and adhered to. 4. Contactor will provide and install the new 2-ton hoist as per manufacturer specifications and ensure proper alignment and secure mounting of hoist, reconnect hoist to existing electrical systems and verify electrical connections are compliant with relevant codes and standards, and ensure control systems are fully functional. B. The contractor provided hoist will meet the following technical specifications: 1. Capacity: o 2 Ton 2. Duty Classification: o Must meet ASME H4 or CMAA H4 duty class standards. 3. Lift Height: o 32 feet 4. Safety Wraps: o System must have a minimum of one (1) safety wrap. 5. True Vertical Lift: o Yes, the system must provide a true vertical lift. 6. Voltage Requirements: o 460V, 3-phase, 60Hz o 115V control circuit 7. Location: o Indoor installation only. 8. Hoist Speed: o 22 feet per minute (FPM), single-speed operation. 9. Trolley Speed: o 45 feet per minute (FPM), single-speed operation. 10. Beam/Rail: o 3.25-inch patented track for the trolley system. 11. Limit Switches: o Geared limit and block-operated limit switches for maximum safety. 12. Pendant Control: o Pendant with an up-to 22'-0" drop, capable of controlling both hoist and trolley functions (1H, 1T). o The customer will specify the pendant drop length before placing the order. Additional charges may apply if the required drop exceeds the stated maximum. 13. Hoist Brakes: o Disc-type motor brake. o Mechanical load brake. 14. Paint: o The hoist system shall be coated in yellow enamel paint for visibility and protection. 15. Factory Load Test: o The hoist must be factory load tested and certified prior to delivery. Special Motor Requirements: o Motor and brakes must be labeled for Class 1, Division 1, Group D environments. o Motor specifications: 3 horsepower (HP) at 1800 RPM. Special Mechanical Requirements: o Bronze trolley wheels. o Bronze hook. o Stainless steel wire rope. o Patented track wheels. Special Electrical Requirements: o The system must meet Class 1, Division 1, Group D hazardous area electrical classification. o NEMA 7/9 control enclosure. o Intrinsically safe circuits must be included for limit switches and pendant control.

Bid Results

Water / Sewer

$114,285.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
330
Active Projects
174
Bidding Soon
2,489
All Active Projects
1,087
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2024

November 18, 2024

img_map_placeholder

S Mill St, Haverhill, MA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.