Site work for a mixed-use development in Fresno, California. Completed plans call for site work for a educational facility; and playground / park / athletic field.
NOTICE TO CONTRACTORS: The Orange Center School District, acting by and through its Governing Board, hereinafter referred to as the Owner, will receive sealed bids for the award of contracts for the construction of the New Shade Structure & Play Structure at Orange Center Elementary School at 3530 S. Cherry Ave., Fresno CA 93706. Completed DIR Information: Within 24 hours of the opening of the bids, the apparent low bidder shall submit completed DIR information on the Subcontractor List to the Orange Center School District at its offices located at 3530 S. Cherry Ave., Fresno CA 93706. DVBE Information: Within 24 hours of the opening of the bids, the apparent low bidder shall submit the Prime Bidder Good Faith Effort Worksheet and Prime Bidder Certification of Disabled Veteran Business Enterprise Participation forms to the Orange Center School District at its offices located at offices located at 3530 S. Cherry Ave., Fresno CA 93706. DESCRIPTION OF WORK: The Work includes the installation of new 20'x20' Shade Structure, Play Structure and softfa11 surface with related on-site improvements. BASIS FOR BIDS: Bids shall be on a lump sum basis. TIME OF COMPLETION: The Work shall be completed within 60 calendar days from the date of the Owner's Notice to Proceed. EXAMINATION AND PROCUREMENT OF CONTRACT DOCUMENTS: Contract Documents have been prepared by Mangini Associates Inc. The architect's contact for questions or RFI's is Jose Delgadillo at jose@mangini.us. Digital plan sets are available in .pdf format by contacting Bridgette Young at bridgette@mangini.us. A non-refundable charge of $20.00, made by separate check, will be required for all sets requiring shipping and handling. Additional complete sets may be purchased from the Architect at the price of 1.15 times the Architect's cost of reproduction and delivery. Specifications and drawings will also be issued to various Builders Exchanges for subcontractors' use or subcontractors may purchase complete sets from the Architect at the price of 1.15 times the Architect's cost of reproduction and delivery. Purchased sets are non-refundable. No partial sets or individual sheets will be issued or sold. Only plan holders and the listed exchanges will be notified of Addenda. SUBSTITUTIONS: Pursuant to California Public Contract Code Section 3400, contractors and material suppliers shall submit requests to the Architect, not less than 10 days prior to bid (if material is to be included on final addendum), all data substantiating a request for substitution of materials. In order to be considered, substitutions of materials or equipment must comply with the requirements of specification Section 01 2500, including providing comparative data and samples. BID SECURITY: Submit bid security with proposal, made payable to Owner, in amount of 10% of the Bid, in the form of certified check, bid bond, cashier's check or cash. Bid security will be retained until Agreement is signed and required bonds furnished. If any bidder refuses to sign the Agreement Form within 7 days after Award, the Owner will retain his bid security as liquidated damages. To enable compliance with California Code of Civil Procedure Section 995.311, each contractor shall provide, prior to Contract Award, a print-out of information from the Department of Insurance website. QUALIFICATION OF BIDDER: The Owner will not consider or accept any bids from contractors or subcontractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code of the State of California, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the Contractor shall have a Class B license and shall maintain that license in good standing through Project completion and all applicable warranty periods. AWARD: The Owner reserves the right to reject any and all bids and/or waive any informality in any bid received and/or determine in its discretion the responsibility of any bidder, and which bid is most advantageous to the Owner. Unless otherwise required by law, no bidder may withdraw his bid for a period of 60 days after the date set for the opening thereof, or any authorized postponement thereof. The Owner reserves the right to take more than 60 days to make a decision regarding the rejection of bids or the award of the Contract. PREVAILING WAGES: The Project is a public work and under California Labor Code Sections 1720 et seq. ("Prevailing Wage Law") and concurrently subject to 40 United States Code Sections 276a, et seq. (the "Davis-Bacon Act," as amended). The text of California Labor Code Sections 1771,1775,1776,1777.5,1813, and 1815 is deemed inserted herein. The Director of the California Department of Industrial Relations ("DIR") has determined the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which the work is to be performed, for each craft, classification or type of worker needed to execute this Contract. Copies of the Prevailing Wage Law and Davis-Bacon Act wage determinations are on file at the Owner's principal office. The Contractor and each of its subcontractor shall fully comply with Prevailing Wage Law and the Davis-Bacon Act, including, without limitation, the obligation to pay not less than the higher of the Prevailing Wage Law or Davis-Bacon specified rates to all workers employed in the execution of this Agreement. DIR REGISTRATION: The Owner will not accept any bid or enter into any contract without proof of the bidder's current registration to perform public work under Labor Code Section 1725.5. Bidders shall not accept any subbid or enter into any subcontract without proof of the subcontractor's current registration to perform public work under Labor Code Section 1725.5. LABOR COMPLIANCE: Contractor and all subcontractors shall comply with Labor Code Section 1776. In accordance with Labor Code section 1771.4(a)(1 ), the Project is subject to compliance monitoring and enforcement by the DIR. The Contractor and each subcontractor shall furnish a certified copy of all payroll records directly to the Labor Commissioner on a monthly basis, unless directed by the Owner to furnish such records more often, and in the format prescribed by the Labor Commissioner. RETENTION FUND: The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between Owner and Contractor and General Conditions. REQUIRED CERTIFICATIONS: Bids must be accompanied by the following forms, fully executed by each Bidder: 1 Non-Collusion Affidavit. 2 Contractor's Certificate Regarding Workers Compensation . 3 Fingerprinting Notice and Acknowledgment. 4 Sufficient Funds Declaration . 5 Acknowledgment regarding Drug Free Workplace . 6 Acknowledgment regarding Alcoholic Beverage and Tobacco-Free Campus Policy . 7 Acknowledgment regarding No Contracting with Sanctioned Entities DSA OVERSIGHT PROCESS: The Contractor shall comply with the applicable requirements of the Division of State Architect ("DSA") Construction Oversight Process ("DSA Oversight Process"), including but not limited to (a) notifying the Project Inspector upon commencement and completion of each aspect of the work as required under DSA Form 156; (b) coordinating the Work with the Project Inspector's inspection duties and requirements; (c) submitting verified reports under DSA Form 6-C; and (d) coordinating with the Owner, Owner's Architect, any Construction Manager, any laboratories, and the Project Inspector to meet the DSA Oversight Process requirements without delay or added costs to the Project. DVBE REQUIREMENTS: The Owner will require the successful Bidder to achieve the minimum goal of 3% DVBE (Disabled Veteran Business Enterprises) established in the bidding documents or to provide acceptable evidence of good faith efforts to do so.
Award
Playgrounds / Parks / Athletic Fields
$315,738.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2024
October 21, 2024
3530 S Cherry Ave, Fresno, CA
Related To This Project
Fresno, CA
Bid Date: Sep 23 2024
Fresno, CA
Bid Date: Oct 08 2024
Fresno, CA
Bid Date: Oct 03 2024
Fresno, CA
Bid Date: Oct 08 2024
Fresno, CA
Bid Date: Oct 31 2024
Fresno, CA
Bid Date: Oct 31 2024
Fresno, CA
Bid Date: Oct 01 2024
Fresno, CA
Bid Date: Oct 08 2024
Fresno, CA
Bid Date: Oct 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.