BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2024 at 8:00 PM

Updated August 19, 2025

Site work and paving for a mixed-use development in Temecula, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Traffic Signal Pedestrian Signal Equipment Upgrade Phase 2 - Citywide. FPNHSIPSL 5459-034 Question Deadline 10/01/2024 at 2:00 PM PT Online Q&A Yes Questions pertaining to this project shall be directed to Nick Minicilli, Senior Civil Engineer / Project Manager, and only submitted through the PlanetBids website Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,000.00 per day for each calendar day completion is delayed beyond the time allowed pursuant to paragraph 4 of the Contract. Estimated Bid Value $326,260.00 Start/Delivery Date To be determined. Project Duration 40 Working Days. Scope of Services The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the Contract Documents to construct for the above-stated project. he general items of work include removal of existing signal equipment and furnish and install traffic signal equipment at 54 intersections complete and in place, including new LED pedestrian indications and ATC controllers, and all incidental work and materials. ATC controllers to be furnished and installed by the City. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No Contractor or subcontractor may be awarded a contract for public work unless registered with the DIR pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring & enforcement by the DIR. Protest Procedures: Pursuant to Chapters 3.28.350 and 3.32.060 of the City of Temecula Municipal Code, any actual or prospective bidder, proposer, or contractor (collectively "bidder") who believes he or she has been aggrieved in connection with the solicitation or award of a contract pursuant to this Chapter may protest, in writing, to the Office of the City Clerk, within three (3) business days after posting of the award recommendation at the location where bids or proposals are submitted.

Bid Results

Roads / Highways

$209,009.00

Public - City

Paving, Site Work

4

12

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

November 7, 2024

Project location map

Multiple Locations, Temecula, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.