Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Boynton Beach, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Counties: Palm Beach Road Name: SR-804/boynton Beach Blvd From N Congress Ave to Nw 8th St Limits: 93200000 Project(s): 44766715201(*) Federal Aid No: N/A Project(s): 44766715202 Federal Aid No: N/A Total Roadway Length: 2.736 Miles Contract Days: 208 Total Bridge Length: 0.014 Miles Total Proposal Length: 2.750 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time:120 Please Read the Full Advertisement Description: The Improvements under this Contract consist of, but are not limited to, MOT (standard, special detour, traffic control officer, channelizing, traffic detection), protections (inlet), monitor structures (inspection, settlement, vibration), bridge (expansion joint), concrete (removal, curb and gutter, sidewalk, driveways), asphalt (milling, resurfacing, miscellaneous), guardrail (general, special post, transition, end treatment, removal), pavement markings painted, thermoplastic, detectable warning), signing (single-column, multi-column, panel install, panel remove, enhanced highway solar powered, reflective strip, object marker, RPM), signalization (conduit, pull box, loop assembly), traffic monitoring (vehicle sensor, inductive loop, conduit, pull/splice box), utilities (manhole and valve adjustments), and sod along State Road 804 (Boynton Beach Boulevard) for 0.684 miles from North Congress Avenue to NW 8 Street in the City of Boynton Beach, Palm Beach County. Pre-qualified: Contractor Must Be Pre-qualified. Performance Bond: a Contract / Performance Bond is Required for This Project. Question Deadline 09/27/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Resurfacing - SR-804
Bid Results
Roads / Highways
$1,352,924.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2024
October 14, 2024
Boynton Beach Blvd, Boynton Beach, FL
Related To This Project
Boynton Beach, FL
Bid Date: Nov 07 2024
Boynton Beach, FL
Bid Date: Oct 21 2024
Boynton Beach, FL
--
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: Oct 30 2024
Boynton Beach, FL
Bid Date: Dec 05 2024
Boynton Beach, FL
Bid Date: Nov 15 2024
Boynton Beach, FL
Bid Date: Nov 07 2024
Boynton Beach, FL
Bid Date: Sep 30 2024
Boynton Beach, FL
Bid Date: Oct 24 2024
Boynton Beach, FL
Bid Date: Sep 12 2024
Boynton Beach, FL
Bid Date: Sep 09 2024
Boynton Beach, FL
Bid Date: Jul 31 2024
Boynton Beach, FL
Bid Date: Jul 29 2024
Boynton Beach, FL
Bid Date: Jul 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.