Renovation of a laboratory facility in Upton, New York. Completed plans call for the renovation of a laboratory facility.
Brookhaven Science Associates (BSA) is issuing a Request for Quote (RFQ) for floor leveling and epoxy coating per the BNL provided statement of work (SOW). BSA invites you to participate in accorance with the RFQ letter and all supporting attachments. This requirement has been posted on the SAM.gov website under solicitation number RFQ-451845. The proposal due date is September 19, at 5:00 p.m. EDT. Any questions concerning this RFQ must be addressed via email to the attention of Ben Furlow (bfurlow@bnl.gov). The Offeror shall provide all necessary labor, materials, and equipment to provide the needed services detailed in the statement of work and all other attachments as outlined in Enclosure 1, Draft Contract 451845 The Contractor shall be responsible for the following: 1. Prepare the existing concrete floor to be leveled by scarifying the entire area as shown in BSA drawing SK-PD-CDI-2000. The Contractor shall mitigate dust generation using a HEPA vacuum and portable clean tent (provided by BSA). 2. The Contractor shall measure the floor elevation with a precision water level at points on a 6-inch grid pattern. At each point on the grid the Contractor shall place pins cut to the exact height that the levelled surface will be at that point. 3. Laticrete levelling grout (or equivalent - subject to review and approval by BSA) shall be mixed and poured to the top of the pins which remain in the grout. 4. Once the grout is cured the entire surface shall be prepared/scarified to prep for the epoxy coat. The Contractor shall mitigate dust generation using a HEPA vacuum and portable clean tent (provided by BSA). 5. Upon completion of preparation of the levelled floor surface, the contractor shall apply two coats of primer, then a 2mm epoxy coating layer of Stonlux S1 epoxy flooring system. 6. Contractor shall bring their own tools to the site to perform the measuring of floor elevation, shot-blasting, planetary grinding, mixing, pumping and spreading of levelling grout, application of primer and epoxy coating. 7. Contractor shall clean up all waste materials at the end of each day and dispose in a trash in dumpster provided by contractor. 8. Contractor shall be responsible for hauling away and disposal of all waste materials. 9. The Contractor shall warranty the levelled floor materials and workmanship for one year from the completion of the contract. 10. The Contractor shall provide a Job Hazard Analysis (JHA) using the provided template for BSA review 1 week after award of contract. Contractor workers shall complete required training for working at NSLS-II per the JHA The Coherent Diffractive Beamline (CDI) beamline at NSLS-II requires a floor surface flatness of +/- 1.5 mm over full range of the dashed line section shown below, in the newly constructed satellite endstation building (SEB) to allow installation of the experimental Two Detector Motion System (TDMS). The scope of this Statement of Work is to first level the area defined below by building up with concrete approximately 1/4 in to 1 in thick until the required flatness is achieved, and then apply an epoxy coating to protect the levelled surface from wear. The concrete layer shall be a minimum of 1/4 in thick at the high point in the existing floor.
Post-Bid
Laboratories
$100,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 18, 2024
November 18, 2024
98 Rochester St, Upton, NY
Related To This Project
Upton, NY
Bid Date: Aug 05 2024
Upton, NY
Bid Date: Jul 19 2024
Upton, NY
Bid Date: Jun 27 2024
Upton, NY
Bid Date: Jun 27 2024
Upton, NY
Bid Date: Jun 25 2024
Upton, NY
--
Upton, NY
Bid Date: Jun 26 2024
Upton, NY
Bid Date: Jun 12 2024
Upton, NY
Bid Date: May 14 2024
Upton, NY
Bid Date: May 30 2024
Upton, NY
Bid Date: Apr 12 2024
Upton, NY
Bid Date: Apr 16 2024
Upton, NY
Bid Date: Apr 24 2024
Upton, NY
Bid Date: Apr 04 2024
Upton, NY
Bid Date: Mar 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.