BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Yerington, Nevada. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of October 10 , 2024 , this project has not yet been awarded. A timeline for award has not yet been established. The Project consists of road rehabilitation in Silver City, Lyon County, Nevada; to include road reconstruction. The following roadways included in the project and their corresponding treatments are listed below: o High Street - Reconstruction o 2nd Street - Reconstruction o 3rd Street - Reconstruction o 4th Street - Reconstruction o 5th Street - Reconstruction o Gay Street - Reconstruction o Schadd Lane - Reconstruction The Contractor will have 50 working days to complete the Work in compliance with all applicable laws and regulations. The Engineer's Opinion of Probable Construction Costs for this project is $3,000,000 to $4,000,000. Bids will be received for a single prime Contract. Bids shall be on a unit price basis *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A pre-bid conference will not be held. A 5% bid security shall be furnished in accordance with the Instructions to Bidders. All bidders shall be licensed and qualified by the Nevada State Contractor's Board to do the type of work contemplated for this project prior to the time of opening of said bids and shall be skilled and regularly engaged in the general class or type of work. This proposal to the Owner is irrevocable for a period of sixty (60) days after the date of the bid opening. The right is reserved by the Owner to reject any and all bids, waive irregularities, informalities, or nonconformities; or to accept the bids deemed in their best interest, such as the lowest, responsible, responsive bid. The right to add or delete items, or change quantities shown on the bid forms is further reserved by the Owner. Omission or improper completion of any or all of the proper bidding documents may be considered as a reason for rejection of the Bid. Liquidated Damages: $1,200/day Start/Delivery Date: November 4, 2024 Bid Bond: 5.00% Payment Bond: 100.00% Performance Bond: 100.00% Question Deadline 09/19/2024 at 2:00 PM PT For questions regarding this project, and for complete contract requirements, contact: Keith Karpstein, P.E.; (775) 851-4788; DOWL; 5510 Longley Lane; Reno, Nevada 89511; kkarpstein@dowl.com

Bid Results

Roads / Highways

$1,830,000.00

Public - County

Paving, Site Work

22

16

8

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
11
Bidding Soon
182
All Active Projects
67
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

November 4, 2024

img_map_placeholder

Multiple Locations, Yerington, NV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.