Site work for a water / sewer project in Bellevue, Washington. Completed plans call for site work for a water / sewer project.

Construct Approximately 8,200 Lf of Ductile Iron Water Mains o Construct Approximately 2,700 Lf of Erdip Water Mains, Coordinate With Supplier as Required. o Install New Fire Hydrant Assemblies, o Install Replacement Water Services, o Install Individual Prv's, o Relocate Existing Utilities (as Required), o Abandon Asbestos Cement Pipe, o Restore Surface Conditions, Including Asphalt Trench Patching, Concrete Curbs, Gutters and Sidewalks, o Perform Traffic Control, o Other Work as Required To Complete the Project. Bid Bond Required: Each Bid Shall Be Accompanied by a Bid Bond in the Form of Cash, Certified Check, Cashier's Check or Surety Bond in an Amount Equal to at Least 5% of the Amount of Such Bid . Checks Shall Be Made Payable to the City Treasurer. Should the Successful Bid Der Fail to Enter Into a Contract and Furnish a Satisfactory Performance and Payment Bond Within the Time Stated in the Specifications, the Bid Bond Shall Be Forfeited to the City of Bellevue. Supplemental Responsible Bid Der Criteria Supplemental Responsible Bid Der Criteria Will Apply to This Project, and Are Included in the Special Contract Information Section, Item 17. In a Timely Manner, Bidders May Request, in Writing, That the City Modify the Supplemental Criteria. The City Reserves the Right to Modify or Not Modify the Supplemental Criteria In Its Discretion. The City Shall Issue an Addendum, Prior to the Bid Due Date, Should It Modify the Supplemental Criteria. The City Shall Not Modify the Supplemental Criteria After the Bid Due Date, Therefore, Bidders Are Encouraged to Discuss With the Project Manager Immediately and Before the Bid Due Date the Relevancy of the Supplemental Bid Der Criteria. Any Bid Der Determined to Be Not Responsible Based on These Supplemental Criteria May Appeal the City's Determination by Providing Additional Information to the City Within Two 2 Business Days Following Receipt of the City's Written Determination That the Bid Der Was Determined Not Responsible. The City of Bellevue Reserves the Right to Reject Any and All Bid S and to Waive Irregularities and Informalities in the Bid Ding Process. No Bid Der May Withdraw Their Bid for A Period of Ninety (90) Days After the Date and Time Set for the Opening Thereof. The Successful Bid Der Must Comply With the City of Bellevue Equal Opportunity Requirements. The City of Bellevue is Committed to a Program of Equal Employment Opportunity Regardless of Race, Color, Creed, Religion, Gender, Age, National Origin, Pregnancy, Genetic Information, Marital Status, Sexual Orientation (Including Gender Identity), or The Presence of Any Sensory, Physical, or Mental Disability. PRE-BID MEETING In cases involving public health, safety, and welfare, the City may direct the order of completion of the work. The City may also direct the order to completion to address competing project schedules and to better coordinate work with others. 1. Site B-2 " This site must be completed prior April 1, 2025 to facilitate a planned overlay. 2. Site B-3 " This site must be completed prior April 1, 2025 to facilitate a planned overlay. 3. Site B-4 " This site must be completed within 220 calendar days of Notice to Proceed (to improve this critical seismic corridor with a history of water main breaks). Jim Stockwell City of Bellevue Utilities P.O. Box 90012 450 - 110th Ave NE, 5W Bellevue, WA 98009-9012 (425) 452-4868 jstockwell@ bellevuewa.gov PRE-BID CONTACT For information during the bidding period, please contact the Project Engineer: A pre-bid meeting will not be conducted The City of Bellevue's is Also Committed to Complying With Title Vi of the Civil Rights Act of 1964, That Provides "no Person in the United States Shall, on the Ground of Race, Color, or National Origin, Be Excluded From Participation in, Be Denied the Benefits of, or Be Subjected to Discrimination Under Any Program or Activity Receiving Federal Financial Assistance."

Bid Results

Water / Sewer

$6,509,509.00

Public - City

Site Work

66

23

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
48
Bidding Soon
898
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

October 28, 2024

img_map_placeholder

Multiple Locations, Bellevue, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.