BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated May 17, 2025

Site work and paving for a mixed-use development in Clearwater, Florida. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of May 16, 2025, a prospective engineer firm as been selected and constract negotiations are in progress. It is anticipated an engineer will be awraded in 3rd quarter 2025. A firm timeline for start of construction has not been determined. *The closed solicitation has been included below for reference: The purpose of the project is to improve traffic and pedestrian safety on 62nd Avenue North, from West of 49th Street North to 34th Street North (U.S. Hwy. 19 N). Currently, this segment of 62nd Avenue North has turn lane deficiencies at signalized intersections, gaps in sidewalks, and a lack of bicycle accommodations. Services performed pursuant to this contract shall remain in effect for 1280 consecutive calendar day(s) from the commencement date on the Notice to Proceed. This Agreement shall become effective on the date of execution of the Agreement. Question Submission Deadline: September 25, 2024, 3:00pm Pinellas County reserves the right to reject any or all submittals. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$300,000.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
105
Bidding Soon
1,890
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

Project location map

62nd St N, Clearwater, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.