Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 27, 2024 at 8:00 PM

Updated September 28, 2024

Site work for a service station / car wash facility in Clearwater, Florida. Completed plans call for site work for a service station / car wash facility.

EV Charging Infrastructure-US 19 Campus-ARPA Question Deadline 09/19/2024 online submission. Installation of two (2) Ford charging stations on Ford pedestals along with the conduits, conductors, power center, as per the attached specifications and drawings.

Award

Service Station / Car Wash

$40,130.00

Public - County

Site Work

5

15

3

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
282
Active Projects
97
Bidding Soon
1,792
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2024

October 24, 2024

Project location map

US-19, Clearwater, FL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed