Site work, paving and new construction of a water / sewer project in Mentone, Texas. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; and for paving for a water / sewer project.

Base Bid: Furnish and install 1 L.S. Concrete Foundation for a 150,000 gal. Elevated Storage Tank; 1 L.S. 150,000 gal. Welded Steel Single Pedestal Elevated Storage Tank; 1 L.S. Protective Coating for a 150,000 gal. Elevated Storage Tank; 1 L.S. 8-inch Polyethylene Piping from Pump Stations to Elevated Tank; 1 L.S. 8-inch Polyethylene Elevated Tank Discharge Piping; 1 L.S. Elevated Tank Site Work; 220 L.F. 8-foot Chain Link Fence; 1 L.S. 100A Electrical Service at Elevated Storage Tank; 2 Each Replace existing 5 HP Pumps with 10 HP Pumps with VFD at Pump Station No.1 (Phase I); 1 L.S. Modify Electrical at Pump Station No. 1 (Phase I); 2 Each 25 HP Pumps with VFD at Pump Station No.1 (Phase II); 1 L.S. 12' x 12' Fiberglass Building including Foundation at Pump Station No. 1 (Phase II); 1 L.S. Piping and Valves at Pump Station No. 1 (Phase II); 1 L.S. Site Work at Pump Station No. 1 (Phase II); 1 L.S. Standpipe Bypass piping; 5 Each 1-inch Pressure Reducers with Valve Boxes, 2 Each 2" Pressure Reducers with Valve Boxes and 1 L.S. 100A Electrical Service at Elevated Tank. Although a firm timeline has not been confirmed, construction is not expected to start prior to fourth quarter 2024. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. A certified check or bank draft, payable to the order of the OWNER, negotiable U.S. Government bond (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable Surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening ofBids may not be answered. The Work will be substantially completed within 400 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 430 days after the date when the Contract Times commence to run.

Post-Bid

Water / Sewer

$2,000,000.00

Public - County

New Construction, Paving, Site Work

10

11

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
17
Bidding Soon
131
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

November 11, 2024

Project location map

Collins St, Mentone, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.