Renovation of a water / sewer project in Jackson, Michigan. Completed plans call for the renovation of a water / sewer project.

The work includes the following partial listing of items with approximate quantities Clarifier Steel: Abrasive blast clean all steel above the high-water level to a SSPC-SP6 commercial standard and all steel below the high-water level to a SSPC-SP10 near-white metal standard. PROJECT: The work includes the following partial listing of items with approximate quantities: Clarifier Steel: Abrasive blast clean all steel above the high-water level to a SSPC-SP6 commercial standard and all steel below the high-water level to a SSPCSP10 near-white metal standard. Apply a three (3) coat epoxy system to all steel surfaces.Perimeter Handrail: Abrasive blast clean to a SSPC-SP6 commercial standard and apply a two (2) coat epoxy system. Filter Gallery Handrail: Abrasive blast clean the section that can be removed to a SSPC-SP6 commercial standard, relocate to a contained area and apply a two (2) coat epoxy system. Power tool clean the entire section of railing at the stairs that cannot be removed and apply a two (2) coat epoxy system.Repair cracks in the walkway floor.Repairs:1) Replace catwalk (bridge) support beams - primary clarifier west.2) Replace steel weirs with fiberglass weirs - all clarifiers.3) Replace pipe U-bolts and hangers - all clarifiers.4) Replace deteriorated channel sections - all clarifiers.5) Lime trough replacement - Primary clarifiers.6) Roof drain removal - Primary clarifiers.7) Replace trough steel - all clarifiers.8) Steel replacement contingency - all clarifiers. The scope of this work shall include all labor, equipment and materials necessary to complete this project according to the specifications listed in the contract documents. All labor, equipment and materials necessary for completion of the work, but not specifically listed as a pay item, will be deemed to be included in one or more of the pay items listed in the bid sheet. Apply a three (3) coat epoxy system to all steel surfaces. Perimeter Handrail: Abrasive blast clean to a SSPCSP6 commercial standard and apply a two (2) coat epoxy system. Filter Gallery Handrail: Abrasive blast clean the section that can be removed to a SSPC-SP6 commercial standard, relocate to a contained area and apply a two (2) coat epoxy system. Power tool clean the entire section of railing at the stairs that cannot be removed and apply a two (2) coat epoxy system. Repair cracks in the walkway floor. Repairs:1) Replace catwalk (bridge) support beams - primary clarifier west.2) Replace steel weirs with fiberglass weirs - all clarifiers.3) Replace pipe U-bolts and hangers - all clarifiers.4) Replace deteriorated channel sections - all clarifiers.5) Lime trough replacement - Primary clarifiers.6) Roof drain removal - Primary clarifiers.7) Replace trough steel - all clarifiers.8) Steel replacement contingency - all clarifiers.

Bid Results

Water / Sewer

$776,000.00

Public - City

Renovation

13

28

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
72
Bidding Soon
1,499
All Active Projects
662
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

October 15, 2024

img_map_placeholder

740 E Mansion St, Jackson, MI

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.