BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 20, 2024 at 7:00 PM

Updated December 21, 2024

Renovation of a detention facility in Sterling, Colorado. Completed plans call for the renovation of a detention facility.

Reference Number 0000366791 Estimated Construction Cost: $31,000,000.00 This project consists of replacing the security systems for the Sterling Correctional Facility. Contractors have already been pre-qualified for this project, and we are only accepting bids from the contractors on the pre-qualification list. Question Deadline 11/18/2024 at 5:00 PM MT The project is funded through the State of Colorado and is subject to the State Prevailing Wage and Apprenticeship requirements of the Office of the State Architect. Scope of Services: The project includes replacing the Door Control, Intercom, Paging, Access Control, Fiber Network, Woodwork, Countertops, Cooling Systems for Security Rooms, Uninterruptible Power Supply (UPS), and Transient Voltage Surge Suppression (TVSS) systems. The project includes the work shown on the Electronic Security (ES), Technology (TY) Security Drawings, the E series Electrical Drawings, and M Series Mechanical Drawings. The work also includes the work described in Specifications 28 70 00 through 28 70 95. The new system will require a Programmable Logic Controller (PLC) based control system in which all systems are to be integrated. If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.

Post-Bid

Jails / Prisons

$31,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
51
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

February 19, 2025

Project location map

12101 CO-61, Sterling, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.