Site work for a water / sewer project in Huntsville, Alabama. Completed plans call for site work for a water / sewer project.
As of November 4, 2024 this project was awarded to McCord Construction in the amount of $1,153,981.50 The Madison County Commission reserves the right to award this bid on an all-or-none or item by item basis, to refuse all bids, and to waive technicalities. Questions should be directed, in writing, to Vince Moody at vmoody@madisoncountyal.gov and Jennie Weatherly at jweatherly@madisoncountyal.gov Deadline for questions is September 27, 2024, at 3:00 PM. In Phases 1A and 1B, Madison County is seeking to install approximately 7,800 feet of 12-inch diameter water main along the northbound right-of-way of U.S. Highway 231/431. This will provide a new main in some areas and will replace approximately 4,000 linear feet of 2.5-inch diameter PVC water main. The Contractor will be responsible for furnishing and installing the new water main in accordance with the contract documents. (a) The Contractor shall: General Scope of Services . Furnish and install temporary erosion control measures; . Install approximately 7,800 linear feet of new 12-inch diameter ductile iron water main, including hydrant and valve assemblies as shown on the Construction Drawings; (12-inch diameter pipe will be furnished by Madison County) . Furnish and install approximately 460 linear feet of new 8-inch diameter and 6-inch diameter C900 PVC, DR 18 water main. . Perform jack and bore installations at road crossings for new main as shown on Construction Drawings; . Manage traffic control during construction and for any road closures or as required to comply with ALDOT permit requirements; . Pressure test and disinfect the new main and services; . Connect the new main to the existing mains; . Reconnect service lines from existing main to new main; . Repair driveways and culverts to original condition or better; . Abandon existing mains and remove old hydrants and valve boxes; . Landscape yards and right-of way to original condition or better; . Remove temporary devices (sample taps, blow-offs, erosion control devices) from the site. The existing water line shall remain in-service during construction, and work shall be performed to avoid any damage and service disruption to the existing main. The existing main will remain live until the new main and services have been successfully tested, water service lines are installed, and the new main is ready to connect to the existing main. Construction may be performed in phases. All work must be coordinated with Madison County. The Contractor shall furnish and install all materials, including but not limited to concrete, asphalt, backfill, pipe, valves, fittings, hydrants, and appurtenances to perform the work. The work shall be performed according to the conditions, technical specification and drawings provided in this bid package. (b) Contents. Section 2 of this document provides the Instructions to Bidders. The General Conditions are included in Section 3. Special Conditions are provided in Section 4. The Technical Specifications for the project are described in Section 5. Material specifications are listed in Section 6. Appendix A includes the contract forms. Appendix B provides samples of contract documents. Federal ARPA certification form and requirements are included as Appendix C. Should any bidder observe any ambiguity, discrepancy, omission, or error in the drawings and specifications, or in any other bid document, or be in doubt as to the intention and meaning of these documents, the bidder should immediately report such, in writing, to the Engineer: Kirk Mills, Project Manager Kimley-Horn & Associates, Inc Email - Kirk.Mills@Kimley-Horn.com
Award
Water / Sewer
$1,153,982.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 7, 2024
December 6, 2024
Multiple Locations, Huntsville, AL
Related To This Project
Huntsville, AL
Bid Date: Sep 26 2024
Huntsville, AL
Bid Date: Sep 24 2024
Huntsville, AL
Bid Date: Sep 26 2024
Huntsville, AL
--
Huntsville, AL
--
Huntsville, AL
--
Huntsville, AL
--
Huntsville, AL
--
Huntsville, AL
Bid Date: Sep 17 2024
Huntsville, AL
Bid Date: Oct 14 2024
Huntsville, AL
Bid Date: Sep 04 2024
Huntsville, AL
Bid Date: Oct 01 2024
Huntsville, AL
--
Huntsville, AL
Bid Date: Sep 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.