EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 8, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Stillwater, Oklahoma. Completed plans call for site work for a water / sewer project.

As of November 8, 2024, project was awarded to Ellsworth Construction OKC, LLC, awarded amount is $3,058,797.19. Scope of work to primarily include the following: Reconstruction of Monticello Drive from University Avenue to Admiral Avenue, with associated water, sanitary sewer, and drainage improvements. Each bidder is required to submit with their bid a guarantee in the form of an acceptable bidder's bond, a certified check, or a cashier's check on a solvent bank in the state of Oklahoma, and in the amount of not less than five percent (5%) of the amount bid. The successful bidder shall execute a contract within 14 days of Notice of Award by the city. The successful bidder shall file a performance bond, maintenance bond, statutory bond and certificates of insurance in the statutory amounts for public liability and workers compensation insurance at the time of signing the contract. Any agreement entered into as a result of this invitation to bid shall be construed under the laws of the State of Oklahoma, and the venue for enforcement of the agreement shall be Payne County in the State of Oklahoma. The City may issue addenda as may be necessary in the best interest of the public and the City of Stillwater. Addenda issued through Ionwave may amend the date and/or time for receipt of bids or any specification, item, document, or requirement in the Bidding Documents. Question Deadline 09/25/2024 at 5:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing, Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effec

Award

Water / Sewer

$3,058,797.00

Public - City

Site Work

45

11

10

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
55
Bidding Soon
732
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

December 2, 2024

img_map_placeholder

S Monticello Dr, Stillwater, OK


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Monticello Drive Reconstruction and Utility Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.