BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction, renovation and addition to an educational facility in Cleveland, Texas. Design plans call for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and for the addition of a educational facility.

Tarkington Early Childhood School $1.9 - $2.9 million Roof Leak Repairs Interior Painting Flooring Upgrades Energy Efficient LED Lighting and Controls New Ceiling Tiles Plumbing Upgrades Restroom Upgrades Gym Upgrades HVAC Upgrades (Scope TBD) Replace Interior Signage to meet ADA requirements Upgrade Door Hardware to meet ADA requirements Repairs of unknown issues Tarkington Elementary School $13.6 - $16 million Major Interior Renovations New lighting New ceiling tile and grid New flooring Repainting all interiors Secure entrance Repairs New Elementary School - $33.1-$37.6 million The new Elementary number 2 new location / new building 900 student capacity, approximately 110,600 square-foot Middle school additions and renovations - $4-5 million Roof Leak Repairs Cafeteria & Kitchen Renovation (increase core space) New Vestibule to Meet ADA & Security Requirements New Main Entrance Canopy Science Lab Renovations Flooring Upgrades throughout to address moisture issues Covered Walkways Energy Efficient LED Lighting Telescoping Bleachers in Gym New Ceiling Tiles Replacement of Interior Signage to meet ADA requirements HVAC Upgrades (Scope TBD) Repairs of any unknown issues Interior Repainting * - Indicates projects at this location not included in the above price. *Band Hall Renovation & Addition and Auditorium Renovation (see below "Band/Auditorium Expansion & Renovations") High school renovation and CTE addition and AG renovations - $4.9-$6.5 million Career & Technical Education Wing Addition Additional classrooms Ag Shop Addition and Renovation Fencing/Gates for Ag Shop Science Labs Renovations (Fume hoods, flooring) Energy Efficient LED Lighting and Controls Per Energy Code Roof Leak Repair Replace Interior Signage to meet ADA requirements HVAC Upgrades (not in previous bond scope) * - Indicates projects at this location not included in the above price. *Band Hall Renovation (see below "Band/Auditorium Expansion & Renovations") District renovations $3.2-$5 million Utility Upgrades Upgrades Parking Lot Lighting Campus Marquees Mechanical Upgrades & Repairs Electrical Upgrades & Repairs Plumbing Upgrades & Repairs Wastewater Management Plant (1974) Band Hall and Auditorium expansion and renovations $1.4-1.9 million HS Band Hall Renovations, Upgrades & Expansion: Increased rehearsal space Practice rooms Additional storage space for instruments and equipment MS Band Hall Renovations & Upgrades: Soundproofing New carpet MS Auditorium Renovations & Upgrades: Upgraded sound system Upgraded lighting Stage repairs Safety and security enhancements $500,000 - $700,000 Upgrades to Security Vestibules at Every Campus: Tarkington High School Tarkington Middle School Tarkington Early Childhood Entry Access Hardware Upgrades This project is part of the school district’s bond. As of September 10, 2024, the bond election will be held on November 5, 2024, with early voting October 21 - November 1, 2024. The last day to register to vote is Monday, October 7, 2024. It is currently unknown if an architect, construction manager, and general contractor have been contracted with the school district. Further details regarding design and construction timelines have not been released.

Design

Educational

$80,000,000.00

Public - City

Addition, New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
59
Bidding Soon
2,715
All Active Projects
1,057
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.