BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Port Richey, Florida. Working plans call for the demolition of a residential development; and for site work for a residential development.

City of Port Richey NOTICE OF DEMOLITION Residence Structure Gilbert G. Jannelli Re: Residence Structure 7717 Pier Road Port Richey FL 34668 32-25-16-0190-00100-0020 Legal Description: BEHMS SUB PB 3 PG 139 LOT 2 BLOCK 1 OR 8505 PG 3465(TS) The structure at the above referenced location have been determined by the City of Port Richey Building Official and in accordance with City of Port Richey Code of Ordinances to be a blighted / slum structure. This structure poses an immediate and manifest danger to life, health or safety of the general public or occupant. THE STRUCTURE(S) SHALL BE VACATED AND SHALL NOT BE OCCUPIED. The owner(s) of these structures shall demolish these structures and clear the entire site within 60 DAYS of the date the property is posted with an Order to Demolish Slum and Blight Structure as required by the Port Richey Code of Ordinances. If repairs/replacement of said structure is to be made, please contact our office IMMEDIATELY to arrange a formal inspection and set a timeline for repairs/replacement. In the alternative, if an appeal is sought, the owner(s) or any other interested party may do so by submitting a written petition within 30 DAYS of the date the property is posted with an Order to Demolish Slum and Blight as required by the Port Richey Code of Ordinances. The appeal shall be written petition to: City Manager, 6333 Ridge Rd Port Richey, FL 34668 and include a $400.00 fee. Failure to contact the City of Port Richey immediately, appeal within 30 days or demolish within 60 days of the date the property is posted with an Order to Demolish Slum and Blight Structure will cause the City of Port Richey to have this structure demolished and cleared at the owner(s) expense without further notice or hearing. Demolition clearance will include all tangible personal property on site. If payment is not made within 30 days of demolition, the City shall impose a lien upon the property for ALL costs incurred throughout the demolition process. Such lien shall be recorded in the official records of Pasco County and shall accrue interest beginning the day of recording. The method of Contractor Selection has not been Determined at this time.

Final Planning

Residential Subdivision

$200,000.00

Public - City

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
44
Bidding Soon
875
All Active Projects
351
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2024

img_map_placeholder

7717 Pier Rd, Port Richey, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.