BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2025 at 7:00 PM

Updated November 11, 2025

Renovation of a mixed-use development in Orlando, Florida. Working plans call for the renovation of a educational facility.

As of November 10, 2025, a construction manager and an architect has been selected. This project is in the pre-construction/negotiated status. Construction is projected to start in May 2026 with substantial completion in May 2027. *The closed solicitation has been included below for reference: Major elements of the project include: The Method of Contractor Selection Has Not Been Determined at This Time. The School Board of Orange County, Florida is Interested in Entering Into a Contract With a Qualified Firm to Provide Construction Management at Risk Services of a Specified Nature as Outlined in the Contract to Be Entered Into, the Form of Said Contract Being Available at the Web Link Below, for the Esteem Academy Replacement Project Located at 905 Waltham Avenue, Orlando, Florida 32809. The Construction Manager is Responsible for The Successful, Timely, and Economical Completion of the Construction Project. The Project Will Provide Improved Facilities That Meet Orange County Public School’s Design Guidelines. 1. A new 2-3 story facility, approximately 82,000 square feet, which will house the Esteem Academy, Hospital Homebound, and ESE Transition. The facility will house high and middle school students in grades 6 through 12 with approximately 50 student stations. A large portion of the facility will house administration, teaching, and planning. The facility will be located at the old Pine Castle Elementary site on 6.06 +/- acres. 2. Parking at the facility shall accommodate approximately 140 spaces which may require a parking deck. A car loop with a capacity of approximately 12 to 15 cars will be required. 3. Site improvements, including but not limited to grading, drainage, retaining walls, underground utilities, stormwater retention, etc., are required to support the new facility. 4. Additional site amenities will include a basketball court, pickle ball court, bocce ball court, four square, greenhouse, labyrinth/maze, and calming area. The estimated construction cost is $50,094,000. The Construction Management firm is to provide all professional services to deliver to the owner a safe, finished, and fully functioning School Facility within the estimated construction budget. Target Schedule: Design Services Commencement: February 2025 Pre-construction Services Commencement: May 2025 Construction Notice to Proceed: May 2026 Substantial Completion: May 2027 QUESTION DEADLINE: December 11, 2024 at 2:00 PM EST

Pre-Construction/Negotiated

Educational

$50,094,000.00

Public - County

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
347
Active Projects
155
Bidding Soon
2,490
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.