Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 12, 2024 at 8:00 PM
Updated September 13, 2024
Site work and paving for a civil project in Buckeye, West Virginia. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The structure carries West Virginia (WV) Route 39 over the Greenbrier River and is located approximately 8.03 mile east of the junction with United States (US) Route 219. The existing structure consists of four (4) continuous wide flange bean spans supported by reinforced concrete abutments and piers. Built in 1959, the overall length of the structure is approximately 365.8 feet and the roadway width is approximately 28.8 feet. The BARS Number is 384053. This project shall consist of the preparation of contract plans and related documents for the rehabilitation the existing structure. The Consultant shall reference DD-681 and develop the appropriate Traffic Management sent Plan, which will also be required. The Consultant shall reference DD-586 and use pollution prevention and discharge reduction methods in the design. Location: Route 39, Pocahontas County, Wv Federal Project (EN) STBG-0039(423)D Federal Project (CN) STBG-0039(425)D As part of the MVDOH's desire to facilitate safety discussions for transportation projects, the Consultant shall complete and submit to the Traffic Engineering Division, the Safety Assessment for Every Roadway (SAFER) Form for the p the project as part of the Preliminary Field Review and Final Office Review. NEPA Documentation will be handled in-house by the Technical Support Division. Post Design Services, if required, shall be by a separate Agreement.
Conceptual
Bridges / Tunnels
$400,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2024
September 23, 2025
WV-39, Buckeye, WV
Related To This Project
Buckeye, WV
Bid Date: Aug 12 2025
Buckeye, WV
Bid Date: Mar 05 2024
Buckeye, WV
Bid Date: Mar 14 2023
Buckeye, WV
Bid Date: Jun 14 2022
Buckeye, WV
Bid Date: May 04 2022
Charles Town, WV
Bid Date: Oct 30 2024
Chesapeake, WV
--
Chester, WV
Bid Date: Sep 23 2024
Charleston, WV
Bid Date: Oct 16 2024
North Parkersburg, WV
Bid Date: Sep 26 2024
Rainelle, WV
Bid Date: Oct 11 2024
Hedgesville, WV
Bid Date: Sep 20 2024
North Parkersburg, WV
Bid Date: Sep 20 2024
Duhring, WV
Bid Date: Oct 08 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
