Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 7, 2024 at 8:00 PM
Updated October 8, 2024
Site work for a water / sewer project in Ballard, Utah. Working plans call for site work for a water / sewer project.
The Cedarview Montwell Special Service District (CMSSD) is requesting statements of qualification (SOQ) from qualified contractors for the construction of the Victory Pipeline Connection Project, 2024. This phase is to pre-qualify contractors based upon statements of qualifications. Contractors that are pre-qualified will be invited to participate in a subsequent cost bidding phase where the project will be awarded to the lowest responsible, responsive bidder. Inquiries regarding the RFSQ should be directed to Sunrise Engineering, Inc. Jeff McCarty (801) 400-9216 jmccarty@sunrise-eng.com Project Description This project is located west and northwest of Roosevelt City in Duchesne County, Utah. On Crooked Sky Rd, a new 8-inch PVC or HDPE line will be installed starting at the existing Victory Pipeline tiein vault. The new pipe will be installed within the county dirt road disturbance or within a marked easement parallel to private dirt roadways or cross county north to Bluebell Rd, approximately 13,800 feet. The pipe will be bored underneath Bluebell Rd. The bore will have a casing around the pipe. The pipe will turn east and follow along the north side of Bluebell Rd within the road ROW for approximately 3,450 feet. The pipe will turn north at 4900 W and again follow marked easements parallel to dirt roadways, or cross country, or within county dirt road disturbances until it reaches 4300 W, approximately 12,725 feet. The pipe will then follow parallel to 4300 W in the road ROW until it intersects with 4000 N, approximately 2,025 feet. The pipe will cross 4000 N to the north side, then follow parallel to the road until the intersection at 4000 N. The pipe will tie-in to an existing system line on the south side of the road. Along most of the line, there will be placement of tees, crosses, valve clusters, and hydrants. New service connections will be installed at a handful
Final Planning
Water / Sewer
$200,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 25, 2024
April 7, 2025
Multiple Locations, Ballard, UT
Related To This Project
Ballard, UT
Bid Date: Aug 06 2025
Ballard, UT
Bid Date: Jun 18 2024
Ballard, UT
Bid Date: Apr 02 2024
Ballard, UT
Bid Date: Feb 20 2024
Ballard, UT
Bid Date: Mar 08 2022
Ballard, UT
Bid Date: Dec 21 2021
Ballard, UT
Bid Date: Aug 01 2023
Ballard, UT
Bid Date: Jul 27 2023
Ballard, UT
Bid Date: Apr 25 2023
Bluffdale, UT
--
Salt Lake City, UT
--
Riverton, UT
Bid Date: Sep 19 2024
West Valley City, UT
Bid Date: Oct 31 2024
Salt Lake City, UT
Bid Date: Oct 10 2024
Moroni, UT
Bid Date: Sep 12 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
