BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2025 at 7:00 PM

Updated February 21, 2025

Site work for a civil project in Trenton, Missouri. Completed plans call for site work for a bridge / tunnel; and bridge / tunnel.

The Project consists of construction of longitudinal stone fill toe protection with tie backs upstream from the Mo DOT Hwy 6 bridge on the Thompson River. Base bid work consists of furnishing & installing 6, 500 tons of rock blanket for Longitudinal Stone Fill Protection (LSFP), 2,500 S.Y. of a 6" layer of 1" stone, and other items for LSFP and tiebacks 1-3. Add Alternate 1 work consists of furnishing and installing an additional 2,125 tons of rock blanket for LSFP and 850 S.Y. of a 6" layer of 1" stone for LSFP and tieback 4. Add Alternate 2 work consists of furnishing and installing an additional 1,875 tons of rock blanket for LSFP and 750 S.Y. of a 6" layer of 1" stone for LSFP and tieback 5. Add Alternate 3 work consists of furnishing and installing an additional 2,225 tons of rock blanket for LSFP and 890 S.Y. of a 6" layer of 1" stone for LSFP and tieback 6. The required substantial completion date is April 25, 2025 Docs notes : The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder s date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Bid Documents can also be obtained in PDF form from All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing

Award

Water / Sewer

$304,810.00

Public - County

Site Work

7

18

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
85
Bidding Soon
741
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

February 13, 2025

Project location map

MO-6, Trenton, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.