BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Trenton, Missouri. Working plans call for site work for a bridge / tunnel; and bridge / tunnel.

As of November 21, 2024, bids received were rejected due to over the badget. Project will rebid but no definite date yet. The Project consists of construction of longitudinal stone fill toe protection with tie backs upstream from the Mo DOT Hwy 6 bridge on the Thompson River. Base bid work consists of furnishing & installing 6, 500 tons of rock blanket for Longitudinal Stone Fill Protection (LSFP), 2,500 S.Y. of a 6" layer of 1" stone, and other items for LSFP and tiebacks 1-3. Add Alternate 1 work consists of furnishing and installing an additional 2,125 tons of rock blanket for LSFP and 850 S.Y. of a 6" layer of 1" stone for LSFP and tieback 4. Add Alternate 2 work consists of furnishing and installing an additional 1,875 tons of rock blanket for LSFP and 750 S.Y. of a 6" layer of 1" stone for LSFP and tieback 5. Add Alternate 3 work consists of furnishing and installing an additional 2,225 tons of rock blanket for LSFP and 890 S.Y. of a 6" layer of 1" stone for LSFP and tieback 6. The required substantial completion date is March 14, 2025. Docs notes : The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder s date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Bid Documents can also be obtained in PDF form from Question Deadline 09/24/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing

Final Planning

Water / Sewer

$500,000.00

Public - County

Site Work

7

16

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
36
Bidding Soon
531
All Active Projects
245
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

May 21, 2025

img_map_placeholder

MO-6, Trenton, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.