Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 9, 2024 at 7:00 PM
Updated October 1, 2024
Site work, paving, outdoor lighting and new construction of a mixed-use development in Bensenville, Illinois. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; water / sewer project; transportation facility; and transportation facility.
The work under this contract includes earthwork and grading, bridge and retaining wall construction, approach lighting with sequence flashing (ALSF) light bar station relocation and control system modifications, electrical cable removal and replacement, airport operation area fence and perimeter road construction, box culvert reconstruction, drainage improvements, erosion control, landscaping, intelligent transportation system (ITS) installation, traffic control and other miscellaneous work. Question Deadline 10/08/2024 at 2:00 PM CT QA deadline change from 10/04/2024 as per ADDA1 Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4658D.4761_Questions@docs.e-builder.net Bidders may be required to be pre-qualified by the Illinois Department of Transportation (IDOT). IDOT Prequalification required: Yes The work to be done under this contract shall be started on or about January 21, 2025. All work under this contract shall be completed by November 21, 2025. The location of the services to be performed for this contract is the Elgin O'Hare Western Access (I-490) between Mile Post 1.0 and Mile Post 2.6 in DuPage County and Cook County, Illinois. The work under this contract includes earthwork and grading, bridge and retaining wall construction, approach lighting with sequence flashing (ALSF) light bar station relocation and control system modifications, electrical cable removal and replacement, airport operation area fence and perimeter road construction, box culvert reconstruction, drainage improvements, erosion control, landscaping, intelligent transportation system (ITS) installation, traffic control and other miscellaneous work. The intended schedule is: 9:15 a.m. to 9:30 a.m. - Arrive and park at 108 Hamilton Lane in Bensenville on the north side of South Access Road (Meeting Site), see attached location map. 9:30 a.m. to 10:30 a.m. - Escorted walk-through at various locations within the project limits including Site 1 and Site 2 11:00 am - Conclusion of site walk-through and return to parking area.
Post-Bid
Transportation Terminals
$50,000,000.00
Public - State/Provincial
New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 31, 2024
January 21, 2025

108 Hamilton Ln, Bensenville, IL
Related To This Project
Bensenville, IL
Bid Date: Oct 08 2024
Bensenville, IL
Bid Date: Jan 29 2025
Bensenville, IL
Bid Date: Jan 29 2025
Bensenville, IL
Bid Date: Jan 14 2025
Bensenville, IL
Bid Date: Feb 11 2025
Bensenville, IL
Bid Date: Mar 04 2025
Bensenville, IL
Bid Date: Mar 05 2025
Bensenville, IL
Bid Date: Mar 07 2025
Bensenville, IL
Bid Date: Aug 06 2024
Bensenville, IL
Bid Date: Aug 06 2024
Bensenville, IL
Bid Date: Jul 08 2024
Bensenville, IL
Bid Date: Jun 26 2024
Bensenville, IL
Bid Date: Jun 14 2024
Bensenville, IL
Bid Date: Jun 04 2024
Bensenville, IL
Bid Date: Jun 04 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Elgin O'Hare Western Access (I-490) Runway 10R Approach Lighting With Sequence Flashing (ALSF) Lighting System Relocation, Earthwork and Bridge ConstructionYork Road to Taft Avenue
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.