BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Arroyo Grande, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

2024 Street Repairs Project In general, the Project consists of asphalt repairs, including Full Depth Reclamation (FDR); Hot Mix Asphalt (HMA) paving; striping; curb ramp reconstructions; temporary traffic control; and related items of work as shown on the Plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer. Contract time is established as 20 working days for Station Way, and 80 working days for the Rancho Phase I, Brighton, and Stagecoach neighborhoods. These are concurrent working days. Contractor may perform work in these areas at the same time. Additionally, Contractor shall note that work on Station Way must be completed by March 2025. Each bid shall be accompanied by either a: 1. certified check 2. cashier's check 3. bidder's bond made payable to the City of Arroyo Grande for an amount equal to ten percent (10%) of the bid amount as a guaranty. Guaranty shall be forfeited to the City Arroyo Grande if the bidder to whom the contract is awarded fails to enter into the contract. The City of Arroyo Grande reserves the right to accept or reject any or all bids or waive any informality in a bid.

Award

Roads / Highways

$3,999,889.00

Public - City

Paving, Site Work

30

4

2

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
15
Bidding Soon
234
All Active Projects
100
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

December 2, 2024

img_map_placeholder

Multiple Locations, Arroyo Grande, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.