BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Los Angeles, California. Working plans call for site work for a water / sewer project.

**As of November 14, 2024, bids for this project has been rejected as the bid cost exceeded the budget . As of this time it is unknown if and when project will rebid. Bundy Underground Remediation. Project consists of construction of the Bundy Underground Remediation, 3171 S. Bundy Dr., Los Angeles, CA 90066 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%. License Requirements CSLB A, HAZ, CADIR Estimated Bid Value $750,000 Start/Delivery Date Est end of November 2024 Project Duration Approx 4 years Increased insurance limits apply as indicated in Scope. Allow ample time for upload of all required bid documents into online. & receive confirmation of submission. No other bid submission method is accepted. If submitting Certified or Cashier's check in lieu of bid bond, upload a copy with bid, and original must be received in a sealed envelope by the SMC Purchasing Office prior to bid due date. Send via signature required 2121 16th St. Santa Monica CA 90405 Attn: Bid# 080124 Purch Office Question Deadline 09/25/2024 at 10:00 AM PT Questions must be submitted Online only, and must be sumbitted prior to specified q&a due date/time. Questions are NOT accepted by email, phone, fax at any time. Bidder, and any sub(s), must hold valid specified CSLB contractor licenses and CADIR registration. This is a prevailing wage project subject to CADIR certified payroll requirements. Scope of Services Qualified contractor to provide prevailing wage labor, materials, services, equipment, transportation necessary to remediate contaminated soil vapor at the Bundy Campus before Santa Monica builds student housing on this site, in accordance with all bid documents. Originals of all submitted bid documents will be required of awarded contractor, if award is made. SMC reserves the right to waive any irregularities, award in whole or in part, or cancel this bid. DVBE (3%) Liquidated Damages $1,000/day of missed substantial completion date and $500/day of missed punch list items date

Final Planning

Water / Sewer

$3,195,410.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
104
Bidding Soon
2,218
All Active Projects
866
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

May 14, 2025

img_map_placeholder

3171 S Bundy Dr, Los Angeles, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.