BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a clubhouse / community center in Warren, Ohio. Completed plans call for the addition of a 4,614-square-foot, one-story above grade clubhouse / community center; for the demolition of a clubhouse / community center; for the renovation of a clubhouse / community center; and for site work for a clubhouse / community center.

Question Deadline 09/20/2024 a written request for interpretation thereof, no later than five (5) days before bids will be opened. City of Warren, Ohio, Will Accept Bids for Packard Park Greenhouse Improvements and Addition. The contract work includes furnishing all material, equipment, tools, labor and services necessary for completion of the project. All work shall be done as shown on drawings called for in the description of the work and in a manner directed by the specifications, in the City of Warren, Trumbull County, Ohio. The Board of Control reserves the right to reject any or all bids and to waive any informality in bidding. Each bidder shall be required to file with his bid guaranty in one of the following forms: (1) A bond, for the full amount of the bid; or (2) A certified check equal to ten percent (10%) of the bid; or (3) A cashier's check equal to ten percent (10%) of the bid; or (4) A letter of credit, pursuant to Chapter 1305 of the Ohio Revised Code, equal to ten percent (10%) of the bid. Any bid guaranty shall be subject to the applicable provisions of Chapter 153 of the Ohio Revised Code to the same extent as if said provisions of Chapter 153 were fully incorporated within said bid guaranty. If a bid is accepted, the successful bidder shall enter into a contract and furnish a Contract Performance Bond as provided for below: (A) A Contract Performance Bond in an amount equal to one hundred (100) percent of the estimated cost of the work conditioned, which includes (but is not limited to) the assurance that the contractor will perform the work upon the terms proposed, within the time prescribed, and in accordance with the plans and specifications. (B) A Payment Bond in an amount equal to one hundred (100) percent of the estimated cost of the work conditioned for the payment by the contractor and all subcontractors for labor performed and materials furnished in connection with the project involved. Bids received from any corporation not chartered in the State of Ohio must be accompanied by proper certification that said corporation is authorized to do business in Ohio. The attention of all Bidders is particularly called to the requirements and conditions of construction to be observed and minimum wage rates paid under this contract. Successful Bidders will be required to pay at least minimum wage rates (Davis Bacon) predetermined by the Secretary of Labor for the project work as required. The Schedule of Approved Wage Rates, as predetermined by the Secretary of Labor, is incorporated in the Contract Documents. This contract is subject to the provisions of Executive Order 11246 of 24 September 1965, as pertains to an Affirmative Action Plan. The attention of Bidders is particularly called to the contract requirements for equal opportunities as set forth in the contract documents. Each Bidder must insure that all employees and applicants for employment are not discriminated against because of race, color, religion, sex or national origin. The successful Bidder will be required to comply with all contract requirements for Equal Employment Opportunities. All Bidders must fill in all blanks of the proposal in ink or submit a typewritten proposal. To be a responsive Bidder, each Bidder must make a commitment in writing that he or she will obtain or seek to obtain at least fifteen percent (15%) minority business participation on this subject contract regardless of phase or tier. This Agreement is subject to the requirement of the Clean Air Act, as amended, 42 USC 1857 et seq., the Federal Water Pollution Control Act, as amended 33 USC 1251 et seq., and the regulations of the Environmental Protection Agency with respect thereto, at 40 CFR Part 15, as amended from time to time. No Bids may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) days. The estimated cost of construction for the project is $400,000.00.

Bid Results

Clubhouse / Community Centers

$725,463.00

Public - City

Addition, Demolition, Renovation, Site Work

18

19

43

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
62
Bidding Soon
1,048
All Active Projects
418
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

November 29, 2024

img_map_placeholder

1701 Mahoning Ave NW, Warren, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.