BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Site work and paving for a sidewalk / parking lot in Vernon, Alabama. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sidewalk improvements along SR-17 north, SR-18 west, butler circle and 5th street sw in the city of vernon This Bracket Range is Shown Only to Provide General Financial Information to Contractors and Bonding Companies Concerning the Projects Complexity and Size. This Bracket Should Not Be Used in Preparing a Bid, Nor Will This Bracket Have Any Bearing on the Decision to Award the Contract. The Principal Items of Work Are Approximately as Follows: The Project Consists of: 534 Sq Yd of Concrete Sidewalk, 4" Thick, 586 Sq Yd of Concrete Driveway, 6" Thick (Includes Wire Mesh) and Other Miscellaneous Items for Sidewalk and Trail Construction Including Traffic Control and Erosion Control Items. The Entire Project Shall Be Completed in 35 Working Days. A Cashier's Check (Drawn on an Alabama Bank) or Bid Bond for 5% of the Amount Bid (Maximum of $10,000.00) and Made Payable to the City of Vernon Must Accompany Each Bid as Evidence of Good Faith. It is Not Required That a Contractor Be Licensed in Order to Submit a Bid; However, Prior to Award of a Contract, Proper Proof of All Applicable Licensures Must Be Provided by the Contractor. Proof of Insurance Coverages of the Types and Amounts as Set Forth in the Project Specifications Will Be Required of the Contractor, and Any and All Subcontractors, Prior to Beginning Work. The Contractor Will Be Required to Perform Work Amounting to at Least 30% of the Total Contract Cost With His Own Organization. The Right to Reject Any or All Bids is Reserved. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
40
Bidding Soon
430
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 9, 2025

Project location map

Multiple Locations, Vernon, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.