Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 23, 2024 at 7:00 PM
Updated December 24, 2024
Renovation of a laboratory facility in Golden, Colorado. Working plans call for the renovation of a laboratory facility.
**As of December 23, 2024 project has been canceled. As of this time it is unknown if and when project will rebid. The Subcontractor shall provide all personnel, labor, management, tools, equipment, and services necessary to ensure that Exterior Insulation and Finish Systems (EIFS) repair and restoration is performed at NREL facilities. The Subcontractor shall ensure that all objectives outlined in this Appendix A - Statement of Work are met in a timely and professional manner. The EIFS Repair agreement will include work such as, but not limited to: o Subcontractor shall provide as-needed Dryvit EIFS repair and restoration. Subcontractor shall follow manufacturer's guidance. o The Subcontractor shall provide all supplies and chemicals as required to complete all tasks outlined in the SOW. Additional details are provided in the Statement of Work attached to this Notice. Technical Question Due Date 9/17/2024 A. Work included: The repair and refinishing of existing EIFS system as required to complete the related scope of work to provide new sealant at existing frames, openings, and building facade joints. Repair procedures to be per EIFS manufacturer's requirements as well as Dow EIFS / DOWSIL Restoration Guide recommendations. B. EIFS repairs/refinishing to be of a type and method approved for Type PB EIF System consisting of adhesive insulation board, reinforcing mesh, and finish on approved substrates. C. Design Requirements: EIFS current published information shall be followed for suggested detail treatments. 1. The minimum slope of inclined surfaces shall be not less than 3" in 12". 2. Maximum deflection of substrate systems shall not exceed L/240. 3. Acceptable substrates include: masonry, concrete, exterior grade gypsum sheathing, cement plaster. 4. Expansion joints are required at building expansion joints, panel joints, and other areas where significant structural movement may occur. 5. Reinforcing fabric to provide high impact resistance and resistance to bird damage.
Final Planning
Laboratories
$300,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2024
June 23, 2025
Multiple Locations, Golden, CO
Related To This Project
Golden, CO
--
Golden, CO
Bid Date: Sep 26 2024
Golden, CO
Bid Date: Oct 22 2024
Golden, CO
Bid Date: Oct 17 2024
Golden, CO
Bid Date: Oct 28 2024
Golden, CO
Bid Date: Oct 07 2024
Golden, CO
Bid Date: Oct 11 2024
Golden, CO
Bid Date: Oct 11 2024
Golden, CO
Bid Date: Sep 12 2024
Golden, CO
Bid Date: Sep 10 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
