BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2024 at 7:00 PM

Updated December 24, 2024

Renovation of a laboratory facility in Golden, Colorado. Working plans call for the renovation of a laboratory facility.

**As of December 23, 2024 project has been canceled. As of this time it is unknown if and when project will rebid. The Subcontractor shall provide all personnel, labor, management, tools, equipment, and services necessary to ensure that Exterior Insulation and Finish Systems (EIFS) repair and restoration is performed at NREL facilities. The Subcontractor shall ensure that all objectives outlined in this Appendix A - Statement of Work are met in a timely and professional manner. The EIFS Repair agreement will include work such as, but not limited to: o Subcontractor shall provide as-needed Dryvit EIFS repair and restoration. Subcontractor shall follow manufacturer's guidance. o The Subcontractor shall provide all supplies and chemicals as required to complete all tasks outlined in the SOW. Additional details are provided in the Statement of Work attached to this Notice. Technical Question Due Date 9/17/2024 A. Work included: The repair and refinishing of existing EIFS system as required to complete the related scope of work to provide new sealant at existing frames, openings, and building facade joints. Repair procedures to be per EIFS manufacturer's requirements as well as Dow EIFS / DOWSIL Restoration Guide recommendations. B. EIFS repairs/refinishing to be of a type and method approved for Type PB EIF System consisting of adhesive insulation board, reinforcing mesh, and finish on approved substrates. C. Design Requirements: EIFS current published information shall be followed for suggested detail treatments. 1. The minimum slope of inclined surfaces shall be not less than 3" in 12". 2. Maximum deflection of substrate systems shall not exceed L/240. 3. Acceptable substrates include: masonry, concrete, exterior grade gypsum sheathing, cement plaster. 4. Expansion joints are required at building expansion joints, panel joints, and other areas where significant structural movement may occur. 5. Reinforcing fabric to provide high impact resistance and resistance to bird damage.

Final Planning

Laboratories

$300,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
66
Bidding Soon
1,196
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2024

June 23, 2025

Project location map

Multiple Locations, Golden, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.