Published February 6, 2025 at 7:00 PM
Updated February 7, 2025
Site work for a bridge / tunnel in Eagle Rock, Virginia. Completed plans call for site work for a bridge / tunnel.
UPC : 121221 Federal Project Number STP-BR02(476) Route Number 621 County City: Botetourt District: Salem Construction Begin Site : 2.55 Mi. To Allegany Co. Line Construction End Site 0.55 Mi. Int. Rte. 615 Time Limit : 11/21/2025 DBE 8 Last Date to Post Questions: 12/06/2024 VDOT - L71 - Culvert Replacement Over Roaring Run The Virginia Department of Transportation (VDOT) is firmly committed to the formation of a partnering relationship with the Contractor, all subcontractors, suppliers, FHWA representatives; where appropriate, other federal agencies, local government officials, utilities representatives, law enforcement and public safety officials, consultants, and other stakeholders to effectively and efficiently manage and complete each construction or maintenance contract to the mutual and individual benefits and goals of all parties. Partnering is an approach to fulfilling this commitment where all parties to the contract, as well as individuals and entities associated with or otherwise affected by the contract, willingly agree to dedicate themselves by working together as a team to fulfill and complete the construction or maintenance contract in cost effective ways while preserving the highest standards of safety and quality called for by the Contract combined with the goals of on time/on budget completion. The approach must still allow for the fact that the members of the team share many common interests yet have differing authorities, interests, and objectives that must be accommodated for the project to be viewed as successful by all parties. It is recognized by VDOT that partnering is a relationship in which: o Trust and open communications are encouraged and expected by all participants o All parties move quickly to address and resolve issues at the lowest possible level by approaching problems from the perspectives and needs of all involved o All parties have identified common goals and at the same time respect each other's individual goals and values o Partners create an atmosphere conducive to cooperation and teamwork in finding better solutions to potential problems and issues at hand This work shall consist of employing Portable Temporary Rumble Strips (PTRSs) in support of workzone flagging operations at locations or times designated herein, on the Plans, in the VWAPM, or as directed by the Engineer. A PTRS is a transverse rumble strip that consists of intermittent, narrow, transverse areas of rough-textured or slightly raised or depressed surface that extends across the travel lane to alert drivers to unusual vehicular traffic conditions. PTRSs are not required during emergency work, or during rain, snow, or icy weather conditions, as determined by the Engineer. Retroreflectors are retroreflective surfaces that redirect the vehicle headlights back to the driver to delineate the road. The retroreflective surface may consist of a plastic prismatic reflector or retroreflective sheeting. Retroreflectors are used with: o Pavement Markers (Permanent and Temporary) o Delineators (Guardrail, Barrier, Flexible Post, Road Edge) Pavement markers and Delineators shall be approved by reviewing performance data from one or both of the following test programs: (a) AASHTO's National Transportation Product Evaluation Program (AASHTO/NTPEP). Test data values used for approval may be based upon the data generated per the applicable NTPEP Work Plan. (b) VDOT Test Facility - VDOT may elect to evaluate performance from their own test facility. This work shall consist of constructing one or more courses of asphalt concrete on a prepared foundation in accordance with these Specifications and within the specified tolerances for the lines, grades, thicknesses, and cross sections shown on the plans or established by the Engineer. At the Contractor's option, the asphalt concrete mix may be produced using a warm-mix additive or warm-mix process approved by the Department. When used, the temperature placement limitations for Warm Mix Asphalt (WMA) shall apply. This work shall also consist of constructing asphalt concrete curb and rumble strips in accordance with these Specifications, plan details, and the Standard Drawings. This work shall consist of providing, installing, maintaining, and removing of Driveway Assistance Devices (DAD) used to guide drivers entering one-lane, bi-directional work zones from driveways to proceed in the proper direction of travel when used with temporary traffic signals. Based on the geologic formations present within the project limits and the geotechnical investigation performed by the Department, acid-producing materials (APM) consisting of pyritic rock and overlying weathered residuum from that rock will be encountered in project excavation. APM contains sufficient pyrite to produce acidic drainage when exposed to atmospheric conditions and weathering processes. It is the responsibility of the Contractor to properly handle, dispose, or treat the project excavation. Any freshly exposed rock cut excavation should be isolated from drainage and protected from saturation or runoff until the excavation can be backfilled with non-APM, limestone off-site borrow.
Award
Bridges / Tunnels
$1,857,331.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2024
February 10, 2025
State Rte 621, Eagle Rock, VA
Related To This Project
Eagle Rock, VA
Bid Date: Sep 11 2025
Eagle Rock, VA
Bid Date: Sep 08 2022
Eagle Rock, VA
Bid Date: Sep 03 2023
Eagle Rock, VA
Bid Date: Jan 10 2023
Eagle Rock, VA
Bid Date: Sep 30 2022
Fore Store, VA
Bid Date: Oct 23 2024
Clinchco, VA
Bid Date: Oct 23 2024
Virginia Beach, VA
Bid Date: Oct 10 2024
Arlington, VA
Bid Date: Sep 16 2024
Marion, VA
Bid Date: Oct 08 2024
Richmond, VA
--
Martinsville, VA
Bid Date: Sep 11 2024
McLean, VA
--
Ruther Glen, VA
--
Portsmouth, VA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.