BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Harvest, Alabama. Completed plans call for site work for a water / sewer project.

The work to be done under the contract shall consist ofthe complete construction of each and every unit described in the plans, these standard specifications, the supplemental specifications, the special provisions, Contract and Notice to Contractors, together with all authorized alterations. The Contractor shall furnish, unless definitely and expressly provided to the contrary in the Proposal and special provision or the plans, all materials, implements, machinery, equipment, tools, supplies, transportation and labor necessary to the prosecution and satisfactory completion of the work. for the construction of the Wall-Triana Highway and McKee Road Water Main Relocation Bidders must certify prior to work under Executive Order 11,246 (Equal Employment Opportunity) as amended. Contractor / Subcontractor will comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4, if applicable to the area of the project. A Performance Bond and a Labor and Material Bond such as described in the 1940 Code of Alabama, Title 50, Section 16,will be required of the successful bidder. The Performance Bond must be in the Penal amount of 100 percent of the Contract Price, and the Labor and Material Bond in the Penal amount of 100 percent of the Contract Price. Same must be executed by a surety company acceptable to the Harvest-Monrovia Water, Sewer and Fire Protection Authority, and authorized to do business in the State of Alabama. Bids must be accompanied by a certified check of Bidders' Bond in an amount not less than five (5%) percent of the bid, but not more than $10,000.00. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject any and all bids, and to waive in-formalities. Harvest-Monrovia Water, Sewer and Fire Protection Authority A summary of the work is included below: Installation of five gate valves on existing water mains, approximately 135' of boring under Wall Triana Highway and McKee Road, Installation of 1,160' of 8" ductile iron water main, three fire hydrant assemblies, two gate valves on new water mains, and one water service.

GC Bidding

Water / Sewer

$600,000.00

Public - City

Site Work

6

6

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
23
Bidding Soon
462
All Active Projects
174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

November 14, 2024

img_map_placeholder

Wall Triana Hwy & McKee Rd, Harvest, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.