BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Miami, Florida. Completed plans call for the renovation of a library.

Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). Scope of Work: (Contractor must obtain and submit all permits prior to performing any work.) 1. CONTRACTOR shall review all documents, specifications, plans and scope of work provided by Miami-Dade Public Library System (Support Services Division) for work to be completed. Furnish all labor, equipment and materials required to: Multiple Surface Painting Applications to Various Library Locations Contractor shall submit unit cost for painting applications to multiple surfaces to include concrete/stucco, metal, wood, plastic, fiberglass, structural foam. Contractor shall be required to submit unit cost for materials and labor to complete painting applications to correct surfaces as listed on price proposal form. All work applies to exterior/interior of buildings (doors, walls, concrete/wood/plastic/steel and aluminum surfaces), picket fencing, perimeter walls, signs (wood/aluminum/steel/structural foam), walkways, etc. as noted. Contractor will be required to move all items (I.e. furniture etc.) where painting applications apply, Library staff to assist in direction and placement of items before priming/painting applications. Exterior Colors: walls, security grates/bars and shall be (TBD), Soffits shall be (TBD), exterior doors/jambs both sides and fascia shall be (TBD). Interior Colors: walls, ceilings, doors/jambs both sides shall be (TBD), restroom/shower room walls and ceilings shall be (TBD), Note: All natural brick, rock, decorative designs etc. on buildings to be painted, shall remain natural/ unpainted. (Specific areas will be directed by library project manager at the pre-bid meeting) Pressure cleaning of all exterior walls, soffit, fascia, security grates and doors of buildings also to include walkways to entry from public parking lots/streets with a minimum 3000-psi will be required. ALL INTERIOR SURFACES will be cleaned as required to insure a complete bond for paint/sealer applications, repair damaged areas as required with correct materials to match existing surfaces. Scrape all areas of exterior that pressured water was unable to remove chipped paint, interior surfaces were paint flaking apply will be scraped and correct finish materials will be used to match existing surfaces. All metal surfaces i.e. doors/jambs, security grates, steel columns etc. showing surface rust or rust flaking will be sanded/grinded to original surface, All doors/jambs shall be sanded using a (Mechanical sander) with a 150-grit paper prior to the primer coat. Raw metal will be coated with a (DTM) Direct to Metal primer coat All cracks, holes and heavy paint flaking areas will be filled with flex-lock product, chalk all areas around door frames, windows, etc. for complete primer coat finish, stucco patch required to complete in areas as directed by construction supervisor (areas where stucco finish require repair will apply). Materials shall be 100% acrylic latex, alkyd oil base, direct to metal, stain (concrete/wood applications), primer compatible to all surface conditions and manufactures specifications. All materials used shall be of equal and/or greater quality per manufactures listed: Richards-100% acrylic latex Signature-750 Series, Flood CWF-UV, Richards high gloss aluminum enamel # 1011, Richards direct to metal, Zinsser/123 acrylic primer, PPG/waterborne epoxy (2 components). Primer one coat to all exteriors/interiors of buildings, oil and latex primers will be applied to correct surfaces, primer will be compatible to paint manufacture. Note: If primer coat does not prevent Bleed-Through and completely (Block out/Cover) existing paint, a second primer coat shall be applied to all doors/jambs, building surfaces etc. before finish coat is applied. In accordance with the County's Green Procurement Preferences, the paint solicited through this solicitation shall be lead free and No-VOC (Volatile Organic Compounds). No-VOC paint shall be defined as paint with fewer than 5 VOC grams per liter. In accordance with the County's Green Procurement Preferences, the paint used by the contractor to satisfy the painting requirements in this solicitation shall be Green-Seal certified. Apply two coats of finish color to all exterior/interior surfaces, oil and latex products will be applied to correct surfaces, roof flashing on buildings that has not been painted will remain unpainted. Apply one coat latex epoxy to all surfaces in restroom/shower locker rooms, all other rooms will have two coats acrylic latex applications. All colors will have a SEMI-GLOSS finish. Designated colors to specific areas of building will be as directed by library project manager. Contractor will be responsible for the removal/reinstallation as required of all signs, information boards, etc. on buildings. As required where new signs will be furnished by owner and installed by contractor, placement to be approved by project manager prior to installment. Contractor is to furnish fasteners to match existing. All wood surfaces will be pressured cleaned as per direction of library project manager, wood treatment will be applied as per library project manager. (clear wood finish w/ ultra violet materials, (with Cedar Tint TBD) not wood sealers/ i.e. Thompson''''s) Contractor shall cover all furniture, fixtures, floors etc. with a canvas/tarp to prevent over-spray. All over-spray/excess paint, both new and existing shall be removed from the floors, fixtures, partitions, windows, door hardware etc. (to include paint chips removed during the preparation process, both Interior & Exterior). Before Final Acceptance. Contractor is responsible for attaining ALL pertinent permits (City of Miami, Miami-Dade Building Department, Electrical, Plumbing, Miami-Dade Public Works, Miami-Dade Water and Sewer, DERM, Fire, FDEP, Florida Department of Health, South Florida Water Management, US Army Corps of Engineers, etc.) needed to begin and complete all phases of work within the plans. It shall be the contractor''''s responsibility to ensure that all required regulatory or proprietary permits are obtained prior to commencement of work. Contractor shall obtain all required permits and forward to Miami Dade County Parks within five (5) days of receipt of dry run plans (if any). Contractor to provide any exploratory digging as required; inclusive of hand digging. Contractor is responsible for any and all dewatering required. All necessary permits required for dewatering are the responsibility of the Contractor. Contractor is responsible for all Surveying & Layout required. Red Line (As-built) drawings to be maintained on site at all times. Accurate survey (Inverts, Dimensions, Locations, etc.) to be reflected on red line (as-built) plans. These are to be reviewed on a weekly basis by Library Project Manager. Three signed and sealed as-built to be submitted prior to final payment approval. Refer to item 21 for further as-built requirements. Contractor to coordinate all required inspections/tests and documentation required by any/all governing entities, i.e. City of Miami, Miami-Dade Building Department, Miami-Dade Water and Sewer, Miami-Dade Public Works, Plumbing, Electrical, Fire, Florida Department of Health, DERM, FDEP, South Florida Water Management, FPL, etc. Contractor to call Underground Locating Company and have all underground located at least 48 hrs prior to any excavation commencing. Contractor to provide ticket numbers provided by underground locating company to owner. CONTRACTOR SHALL BE RESPONSIBLE FOR UNDERGROUND LOCATIONS WITHIN THE PROPERTY LINE. Contractor shall provide temporary fencing and safety barriers as directed to maintain a safe work site. Coordinate fencing and barrier requirements with the library project manager as job progresses. MATERIAL or PRODUCT SUBSTITUTIONS: The Miami-Dade County Public Library System has specified certain brand names because it seeks to match products currently in use at other library facilities. Any specified products or systems intended to be substituted by the Contractor, has to be submitted to the Library Project Manager within 30 calendar days after receipt of the Notice to Proceed. Only one (1) request for substitutions will be considered for each product. When substitutions are not accepted, the Contractor shall provide specified product. The request is to be accompanied by complete cost data of the proposed substitution, substantiating compliance with the contract documents, including product identification and description, performance and test data, references and samples where applicable, and an itemized comparison of the proposed substitution with the product specified. Refer to attached form required with proposed substitution. The request is to be accompanied by data relating to contract time schedule and aesthetic effect when applicable. When redesign by the Architect or Engineer is required to accommodate an alternate product or system, all costs of this redesign are to be paid by the Contractor requesting the substitution. When additional work is required by other contractors to accommodate the alternate product or system, all additional cost of this work is to be paid by the Contractor requesting the substitution. Failure to place orders for specified products or systems sufficiently in advance of installation scheduled date(s) not considered a valid reason upon which Contractor may base request for Substitutions or for deviations from Contract Documents. Requested substitution will be accepted as an approved equal or rejected, solely at the discretion of the Library Project Manager with Architect''''s or Engineer''''s written approval. Work required may include, but is not limited to the following trades: Painting, Etc Contractor shall be responsible to furnish all temporary utilities as required to complete all work, this shall include, but is not limited to, electric, water, phone, toilet facilities, etc. Miami Dade County Parks shall not provide any temporary utility services for the contractors use. CONTRACTORS submitting bids for work are responsible to list appropriate subcontractors required to complete all areas of work required. Contractor is responsible for the safety and security of the job site. Any vandalism, theft, etc. which occurs during the construction time is the responsibility of the Contractor. No monetary compensation shall be granted if any of the above occurs. Contractor is required to have proper insurance to cover ongoing work on the job site. If Contractor opts to hire an independent Security Company, such company is to be properly bonded and insured. Permits The vendor shall obtain and pay for all of the project permits in accordance with the guidelines identified below. 1. Permits: The vendor shall determine the various City, County & State permits, certificates, and approvals required to complete this project. 2. Permit Costs: The vendor shall determine the application fee costs for all of the required project permits, certificates, and approvals and include that amount in their fee proposal. A breakdown of each permit and application fee shall be attached to the fee proposal for reference. 3. Applications: The vendor shall fill out and submit all permit applications to the appropriate permitting authorities and the costs shall be paid from the vendor. A copy of the application(s) and the original permit(s) obtained by the vendor shall be given to the Library Project Manager for distribution. Pressure Cleaning The vendor shall provide all equipment, labor and materials required to pressure wash concrete and other surfaces at various library facilities in the designated, commercial areas on a weekly basis. The designated areas are to be cleaned in their entirety (NOT spot-cleaned). The concrete and other surfaces to be cleaned include, but shall not be limited to: sidewalks, entryways, window wells, refuse receptacles, benches, and bus stops or other surfaces. The Library Project Manager shall communicate to the Contractor the delineation of the areas to be pressure washed. It is the vendor''''s responsibility to comply with City, County and State code, regarding storm water runoff system discharge regulations and requirements. Compliance includes the implementation of practical methods, known as Best Management Practices (BMPs) which shall be used to protect the environment and to comply with regulatory requirements. Power washing runoff shall be recovered and disposed of properly. Violations of any of these requirements may lead to a civil penalties. The vendor shall present a professional image and maintain a high standard of quality and technical competence. Total responsibility for this is placed upon the selected vendor. The vendor shall furnish all labor and equipment necessary to clean exterior and interior concrete surfaces throughout the facility, primarily focusing on the Commercial Area. The vendor shall: Perform cleaning services to all areas. Furnish equipment capable of delivering high-pressure, hot water (if necessary) suitable for removing stains, spills, etc. from concrete and surfaces without damaging the surface material. In addition, equipment shall be capable of absorbing all runoff from pressure washings to prevent said runoff from entering the storm drain system. The use of chemicals must be approved by the City, County or State as required.

GC Bidding

Library

$3,380,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
125
Bidding Soon
1,767
All Active Projects
749
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 26, 2024

November 25, 2024

img_map_placeholder

9445 Coral Wy, Miami, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.